Skip to content

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentTandridge (South East)

Do I Need Planning Permission for a Single-Storey Side Extension in Tandridge?

A single-storey extension built to the side of your property, often used to add a utility room, downstairs WC, or to widen a kitchen.

Planning in Tandridge

84%

of planning applications granted

91%

decided within the statutory or agreed time

51%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Tandridge decided 701 planning applications. 423 of these were householder projects such as extensions, loft conversions and outbuildings, of which 90% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Tandridge

Tandridge has 19 conservation areas. These include Bletchingley, Broadham Green and Spring Lane, Burstow, Caterham Barracks, Chaldon, Fickleshole. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Tandridge has 45 recorded Article 4 directions. These include Fortunon Farm, Godstone Hill, Godstone.; Land Adj. Tenchleys Farm, Tenchleys Lane, Limpsfield.; Land At Burstow Lodge Farm, Normans Corner, Smallfield.; Land At Dairy House Farm, Green Lane, Outwood.. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Tandridge planning department to check whether an Article 4 direction applies to your property.

Check with Tandridge planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Single-Storey Side Extension

Generally permitted under Part 1, Class A. The extension must not exceed half the width of the original house and must be single storey. It should be subordinate in scale to the main dwelling.

Conditions

  • 1Must not exceed half the width of the original house
  • 2Maximum height of 4m
  • 3Eaves height maximum 3m if within 2m of a boundary
  • 4Must be set back from the principal elevation or side elevation fronting a highway
  • 5Materials must be similar in appearance to the existing house

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: 3m if within 2m of a boundary
  • Width: must not exceed half the width of the original dwelling

When Permitted Development Does Not Apply

  • Must not cover more than half the curtilage
  • Does not apply in front of the principal elevation
  • In designated areas (conservation areas, AONB, etc.), side extensions are not permitted development
  • Does not apply to flats or maisonettes

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval required for structural work, foundations, thermal insulation (Part L), ventilation, damp proofing, and any associated electrical or drainage work.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Tandridge building control or use an approved inspector.

How to Apply in Tandridge

If you need planning permission for your single-storey side extension, you can apply through Tandridge's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Tandridge Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Tandridge. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

The council can issue an enforcement notice requiring alterations or demolition. Side extensions are visible from public areas, making enforcement more likely if they breach planning rules. Indemnity insurance may be available for older unauthorised extensions but does not guarantee protection.

Frequently Asked Questions

Do I need planning permission for a single-storey side extension in Tandridge?
Generally permitted under Part 1, Class A. The extension must not exceed half the width of the original house and must be single storey. It should be subordinate in scale to the main dwelling. Note: Tandridge has 19 conservation areas (including Bletchingley, Broadham Green and Spring Lane, Burstow) and 45 recorded Article 4 directions where permitted development rights may be restricted. Check with Tandridge planning department.
Does a single-storey side extension in Tandridge need building regulations?
Yes. Building Regulations approval required for structural work, foundations, thermal insulation (Part L), ventilation, damp proofing, and any associated electrical or drainage work. Contact Tandridge building control or an approved inspector for details.
How do I apply for planning permission in Tandridge?
You can apply for planning permission through Tandridge's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Tandridge?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Tandridge decided 91% of applications within the statutory or agreed time, and 51% of householder applications within 8 weeks.
What percentage of planning applications does Tandridge approve?
Tandridge granted 84% of the 701 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 90%.

Find a Builder in Tandridge

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Single-Storey Side Extension rules in nearby council areas

Other projects in Tandridge

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co