Do I Need Planning Permission for a Flue or Extraction System in Kingston upon Thames?

Installing a flue, chimney, or extraction system on your property (for example, for a kitchen extractor, boiler, or stove). The permitted development rules are the same as for new chimney/flue installation.

Planning in Kingston upon Thames

75%

of planning applications granted

89%

decided within the statutory or agreed time

81%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Kingston upon Thames decided 1,112 planning applications. 766 of these were householder projects such as extensions, loft conversions and outbuildings, of which 82% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Kingston upon Thames

Kingston upon Thames has 28 conservation areas. These include Cadogan Road Conservation Area, Christ Church Conservation Area, Claremont Road Conservation Area, Coombe Hill Conservation Area, Coombe House Conservation Area, Coombe Wood Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Kingston upon Thames has 3 recorded Article 4 directions. These include Ace of Spades; Alexandra Drive; Berrylands Road; Burlington Road. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Kingston upon Thames planning department to check whether an Article 4 direction applies to your property.

Check with Kingston upon Thames planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Flue or Extraction System

Generally permitted under Part 1, Class G of the GPDO. One flue, chimney, or soil and vent pipe is permitted on a dwelling provided it does not exceed the highest part of the roof by more than 1 metre. The flue must not be on the principal elevation in designated areas.

Conditions

  • 1Must not exceed the highest part of the roof by more than 1m
  • 2Only one flue per dwelling under PD
  • 3Must not be on the principal elevation or side elevation fronting a highway in designated areas
  • 4Kitchen extraction: external vent or ducting follows the same rules
  • 5Must comply with clean air legislation if for a combustion appliance

Size and Dimension Limits

  • Must not exceed the highest part of the roof by more than 1m
  • One flue only under PD

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • In conservation areas, position and appearance restrictions apply
  • Odour and noise from extraction systems can be a statutory nuisance
  • Additional flues beyond the first require planning permission

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply if the flue or extraction system serves a combustion appliance (Part J). Kitchen and bathroom extraction must comply with Part F (ventilation). Gas flues must be installed by a Gas Safe registered engineer. A HETAS-registered installer can self-certify solid fuel installations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Kingston upon Thames building control or use an approved inspector.

How to Apply in Kingston upon Thames

If you need planning permission for your flue or extraction system, you can apply through Kingston upon Thames's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Kingston upon Thames Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Kingston upon Thames. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for standard domestic flues within PD limits. Extraction systems that cause odour or noise nuisance to neighbours are more likely to be addressed under environmental health legislation than planning enforcement.

Frequently Asked Questions

Do I need planning permission for a flue or extraction system in Kingston upon Thames?
Generally permitted under Part 1, Class G of the GPDO. One flue, chimney, or soil and vent pipe is permitted on a dwelling provided it does not exceed the highest part of the roof by more than 1 metre. The flue must not be on the principal elevation in designated areas. Note: Kingston upon Thames has 28 conservation areas (including Cadogan Road Conservation Area, Christ Church Conservation Area, Claremont Road Conservation Area) and 3 recorded Article 4 directions where permitted development rights may be restricted. Check with Kingston upon Thames planning department.
Does a flue or extraction system in Kingston upon Thames need building regulations?
Yes. Building Regulations apply if the flue or extraction system serves a combustion appliance (Part J). Kitchen and bathroom extraction must comply with Part F (ventilation). Gas flues must be installed by a Gas Safe registered engineer. A HETAS-registered installer can self-certify solid fuel installations. Contact Kingston upon Thames building control or an approved inspector for details.
How do I apply for planning permission in Kingston upon Thames?
You can apply for planning permission through Kingston upon Thames's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Kingston upon Thames?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Kingston upon Thames decided 89% of applications within the statutory or agreed time, and 81% of householder applications within 8 weeks.
What percentage of planning applications does Kingston upon Thames approve?
Kingston upon Thames granted 75% of the 1,112 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 82%.

Find a Builder in Kingston upon Thames

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Flue or Extraction System rules in nearby council areas

Other projects in Kingston upon Thames

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co