Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentKingston upon Thames (London)

Do I Need Planning Permission for a Two-Storey Rear Extension in Kingston upon Thames?

A two-storey extension to the rear of your property, adding significant living space on both the ground and first floor. Subject to stricter conditions than single-storey extensions.

Planning in Kingston upon Thames

75%

of planning applications granted

88%

decided within the statutory or agreed time

82%

of householder applications decided within 8 weeks

In the year to December 2025, Kingston upon Thames decided 1,151 planning applications. 803 of these were householder projects such as extensions, loft conversions and outbuildings, of which 81% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Kingston upon Thames

Kingston upon Thames has 26 conservation areas. These include Cadogan Road, Christ Church, Claremont Road, Coombe Hill, Coombe House, Coombe Wood. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Kingston upon Thames has 3 recorded Article 4 directions. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Kingston upon Thames planning department to check whether an Article 4 direction applies to your property.

Check with Kingston upon Thames planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Two-Storey Rear Extension

Generally permitted under Part 1, Class A of the GPDO, but with stricter conditions than single-storey extensions. The maximum depth is 3m from the original rear wall, and the extension must be at least 7m from the rear boundary.

Conditions

  • 1Maximum projection of 3m from the original rear wall
  • 2Must be at least 7m from the rear boundary
  • 3Must not exceed the height of the existing roof ridge
  • 4Roof pitch must match the existing dwelling as far as practicable
  • 5Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor

Size and Dimension Limits

  • Maximum depth: 3m from the original rear wall
  • Must not exceed the height of the highest part of the existing roof
  • Eaves height must not exceed the eaves of the existing dwelling

When Permitted Development Does Not Apply

  • Must not cover more than half the curtilage
  • Must be at least 7m from the rear boundary
  • Does not apply to flats or maisonettes
  • PD rights may be restricted in designated areas
  • The Larger Home Extension scheme does not apply to two-storey extensions

What About Building Regulations?

Building regulations approval is likely required

Full Building Regulations approval required covering structural design, foundations, thermal performance (Part L), fire escape routes, sound insulation between floors, ventilation, and drainage.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Kingston upon Thames building control or use an approved inspector.

How to Apply in Kingston upon Thames

If you need planning permission for your two-storey rear extension, you can apply through Kingston upon Thames's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications; 13 weeks for larger or more complex proposals.
Cost:£258
Visit Kingston upon Thames Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Kingston upon Thames. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement action can require partial or full demolition. Two-storey extensions built without proper permission are particularly problematic when selling, as mortgage lenders and solicitors will flag the issue during conveyancing.

Frequently Asked Questions

Do I need planning permission for a two-storey rear extension in Kingston upon Thames?
Generally permitted under Part 1, Class A of the GPDO, but with stricter conditions than single-storey extensions. The maximum depth is 3m from the original rear wall, and the extension must be at least 7m from the rear boundary. Note: Kingston upon Thames has 26 conservation areas (including Cadogan Road, Christ Church, Claremont Road) and 3 recorded Article 4 directions where permitted development rights may be restricted. Check with Kingston upon Thames planning department.
Does a two-storey rear extension in Kingston upon Thames need building regulations?
Yes. Full Building Regulations approval required covering structural design, foundations, thermal performance (Part L), fire escape routes, sound insulation between floors, ventilation, and drainage. Contact Kingston upon Thames building control or an approved inspector for details.
How do I apply for planning permission in Kingston upon Thames?
You can apply for planning permission through Kingston upon Thames's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications; 13 weeks for larger or more complex proposals..
How long does planning permission take in Kingston upon Thames?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Kingston upon Thames decided 88% of applications within the statutory or agreed time, and 82% of householder applications within 8 weeks.
What percentage of planning applications does Kingston upon Thames approve?
Kingston upon Thames granted 75% of the 1,151 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 81%.

Find a Builder in Kingston upon Thames

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Two-Storey Rear Extension rules in nearby council areas

Other projects in Kingston upon Thames