This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.
Do I Need Planning Permission for an EV Charging Point in Spelthorne?
Installing an electric vehicle charging point on your property. Wall-mounted and post-mounted chargers have specific permitted development rights under Part 2 of the GPDO.
Planning in Spelthorne
81%
of planning applications granted
98%
decided within the statutory or agreed time
73%
of householder applications decided within 8 weeks
In the year to December 2025, Spelthorne decided 668 planning applications. 422 of these were householder projects such as extensions, loft conversions and outbuildings, of which 88% were granted.
Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.
Important: Additional Restrictions May Apply in Spelthorne
Spelthorne has 8 conservation areas. These include Laleham Conservation Area, Lower Halliford Conservation Area, Lower Sunbury Conservation Area, Manygate Lane Conservation Area, Shepperton Conservation Area, Staines Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.
Spelthorne has Article 4 directions in force. These include Ladye Place Ferry Lane Shepperton; Land At Las Palmas And Sandhills Meadow, Shepperton; Land At The Nutshells Abbey Road Shepperton; Rye Peck Meadow Chertsey Road Shepperton. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Spelthorne planning department to check whether an Article 4 direction applies to your property.
Check with Spelthorne planning department before starting work to confirm whether your property is affected by any special designations.
Permitted Development Rules for an EV Charging Point
Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume.
Conditions
- 1One charging point per property under PD
- 2Wall-mounted units must not be on a wall facing a highway
- 3Must not exceed 0.2 cubic metres in volume
- 4Must not be within 2m of a highway (for post-mounted units in designated areas)
- 5Must not be on a listed building or within the curtilage of a listed building (in designated areas)
Size and Dimension Limits
- Maximum volume: 0.2 cubic metres
- One unit per property under PD
When Permitted Development Does Not Apply
- Not PD on listed buildings or within the curtilage of a listed building in designated areas
- Post-mounted units in designated areas must not be within 2m of a highway
- A second charger requires planning permission
- Electrical installation must be carried out by a qualified electrician
What About Building Regulations?
Building regulations approval is likely required
The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection.
Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Spelthorne building control or use an approved inspector.
How to Apply in Spelthorne
If you need planning permission for your ev charging point, you can apply through Spelthorne's planning department or via the national Planning Portal.
If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Spelthorne. This provides proof that your project does not need planning permission, which can be helpful when selling your property.
What Happens If I Build Without Permission?
Very low risk. EV chargers are small and unobtrusive. Enforcement is only likely if the unit is on a listed building without consent or is a second unit installed without permission.
Frequently Asked Questions
Do I need planning permission for an ev charging point in Spelthorne?
Does an ev charging point in Spelthorne need building regulations?
How do I apply for planning permission in Spelthorne?
How long does planning permission take in Spelthorne?
What percentage of planning applications does Spelthorne approve?
Find an EV Charger Installer in Spelthorne
Browse local ev charger installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.