Do I Need Planning Permission for an EV Charging Point in Vale of White Horse?

Installing an electric vehicle charging point on your property. Wall-mounted and post-mounted chargers have specific permitted development rights under Part 2 of the GPDO.

Planning in Vale of White Horse

95%

of planning applications granted

96%

decided within the statutory or agreed time

57%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Vale of White Horse decided 1,015 planning applications. 563 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Vale of White Horse

Vale of White Horse has 55 conservation areas. These include Abingdon - Albert Park Conservation Area, Abingdon - Northcourt Conservation Area, Abingdon Town Centre Conservation Area, Appleton Conservation Area, Ardington and East Lockinge Conservation Area, Ashbury Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Vale of White Horse planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an EV Charging Point

Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume.

Conditions

  • 1One charging point per property under PD
  • 2Wall-mounted units must not be on a wall facing a highway
  • 3Must not exceed 0.2 cubic metres in volume
  • 4Must not be within 2m of a highway (for post-mounted units in designated areas)
  • 5Must not be on a listed building or within the curtilage of a listed building (in designated areas)

Size and Dimension Limits

  • Maximum volume: 0.2 cubic metres
  • One unit per property under PD

When Permitted Development Does Not Apply

  • Not PD on listed buildings or within the curtilage of a listed building in designated areas
  • Post-mounted units in designated areas must not be within 2m of a highway
  • A second charger requires planning permission
  • Electrical installation must be carried out by a qualified electrician

What About Building Regulations?

Building regulations approval is likely required

The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Vale of White Horse building control or use an approved inspector.

How to Apply in Vale of White Horse

If you need planning permission for your ev charging point, you can apply through Vale of White Horse's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Vale of White Horse Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Vale of White Horse. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk. EV chargers are small and unobtrusive. Enforcement is only likely if the unit is on a listed building without consent or is a second unit installed without permission.

Frequently Asked Questions

Do I need planning permission for an ev charging point in Vale of White Horse?
Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume. Note: Vale of White Horse has 55 conservation areas (including Abingdon - Albert Park Conservation Area, Abingdon - Northcourt Conservation Area, Abingdon Town Centre Conservation Area) where permitted development rights may be restricted. Check with Vale of White Horse planning department.
Does an ev charging point in Vale of White Horse need building regulations?
Yes. The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection. Contact Vale of White Horse building control or an approved inspector for details.
How do I apply for planning permission in Vale of White Horse?
You can apply for planning permission through Vale of White Horse's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Vale of White Horse?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Vale of White Horse decided 96% of applications within the statutory or agreed time, and 57% of householder applications within 8 weeks.
What percentage of planning applications does Vale of White Horse approve?
Vale of White Horse granted 95% of the 1,015 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find an EV Charger Installer in Vale of White Horse

Browse local ev charger installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

EV Charging Point rules in nearby council areas

Other projects in Vale of White Horse

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co