Do I Need Planning Permission for a Two-Storey Rear Extension in Stevenage?

A two-storey extension to the rear of your property, adding significant living space on both the ground and first floor. Subject to stricter conditions than single-storey extensions.

Planning in Stevenage

96%

of planning applications granted

90%

decided within the statutory or agreed time

81%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Stevenage decided 253 planning applications. 133 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Stevenage

Stevenage has 7 conservation areas. These include Broadwater Conservation Area, Old Town High Street Conservation Area, Orchard Road Conservation Area, Shephall Green Conservation Area, St. Nicholas / Rectory Lane Conservation Area, Symonds Green Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Stevenage has 126 recorded Article 4 directions. These include Balbir House VISHKARMA PARK Norton Green Road Stevenage; CAXTON POINT Caxton Way Stevenage; Redemption House Gunnels Wood Park; Solutions House Crompton Road Stevenage. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Stevenage planning department to check whether an Article 4 direction applies to your property.

Check with Stevenage planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Two-Storey Rear Extension

Generally permitted under Part 1, Class A of the GPDO, but with stricter conditions than single-storey extensions. The maximum depth is 3m from the original rear wall, and the extension must be at least 7m from the rear boundary.

Conditions

  • 1Maximum projection of 3m from the original rear wall
  • 2Must be at least 7m from the rear boundary
  • 3Must not exceed the height of the existing roof ridge
  • 4Roof pitch must match the existing dwelling as far as practicable
  • 5Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor

Size and Dimension Limits

  • Maximum depth: 3m from the original rear wall
  • Must not exceed the height of the highest part of the existing roof
  • Eaves height must not exceed the eaves of the existing dwelling

When Permitted Development Does Not Apply

  • Must not cover more than half the curtilage
  • Must be at least 7m from the rear boundary
  • Does not apply to flats or maisonettes
  • PD rights may be restricted in designated areas
  • The Larger Home Extension scheme does not apply to two-storey extensions

What About Building Regulations?

Building regulations approval is likely required

Full Building Regulations approval required covering structural design, foundations, thermal performance (Part L), fire escape routes, sound insulation between floors, ventilation, and drainage.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Stevenage building control or use an approved inspector.

How to Apply in Stevenage

If you need planning permission for your two-storey rear extension, you can apply through Stevenage's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications; 13 weeks for larger or more complex proposals.
Cost:£258
Visit Stevenage Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Stevenage. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement action can require partial or full demolition. Two-storey extensions built without proper permission are particularly problematic when selling, as mortgage lenders and solicitors will flag the issue during conveyancing.

Frequently Asked Questions

Do I need planning permission for a two-storey rear extension in Stevenage?
Generally permitted under Part 1, Class A of the GPDO, but with stricter conditions than single-storey extensions. The maximum depth is 3m from the original rear wall, and the extension must be at least 7m from the rear boundary. Note: Stevenage has 7 conservation areas (including Broadwater Conservation Area, Old Town High Street Conservation Area, Orchard Road Conservation Area) and 126 recorded Article 4 directions where permitted development rights may be restricted. Check with Stevenage planning department.
Does a two-storey rear extension in Stevenage need building regulations?
Yes. Full Building Regulations approval required covering structural design, foundations, thermal performance (Part L), fire escape routes, sound insulation between floors, ventilation, and drainage. Contact Stevenage building control or an approved inspector for details.
How do I apply for planning permission in Stevenage?
You can apply for planning permission through Stevenage's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications; 13 weeks for larger or more complex proposals..
How long does planning permission take in Stevenage?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Stevenage decided 90% of applications within the statutory or agreed time, and 81% of householder applications within 8 weeks.
What percentage of planning applications does Stevenage approve?
Stevenage granted 96% of the 253 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find a Builder in Stevenage

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Two-Storey Rear Extension rules in nearby council areas

Other projects in Stevenage

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co