Skip to content

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentStevenage (East of England)

Do I Need Planning Permission for a Single-Storey Side Extension in Stevenage?

A single-storey extension built to the side of your property, often used to add a utility room, downstairs WC, or to widen a kitchen.

Planning in Stevenage

96%

of planning applications granted

90%

decided within the statutory or agreed time

81%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Stevenage decided 253 planning applications. 133 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Stevenage

Stevenage has 7 conservation areas. These include Broadwater Conservation Area, Old Town High Street Conservation Area, Orchard Road Conservation Area, Shephall Green Conservation Area, St. Nicholas / Rectory Lane Conservation Area, Symonds Green Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Stevenage has 126 recorded Article 4 directions. These include Balbir House VISHKARMA PARK Norton Green Road Stevenage; CAXTON POINT Caxton Way Stevenage; Redemption House Gunnels Wood Park; Solutions House Crompton Road Stevenage. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Stevenage planning department to check whether an Article 4 direction applies to your property.

Check with Stevenage planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Single-Storey Side Extension

Generally permitted under Part 1, Class A. The extension must not exceed half the width of the original house and must be single storey. It should be subordinate in scale to the main dwelling.

Conditions

  • 1Must not exceed half the width of the original house
  • 2Maximum height of 4m
  • 3Eaves height maximum 3m if within 2m of a boundary
  • 4Must be set back from the principal elevation or side elevation fronting a highway
  • 5Materials must be similar in appearance to the existing house

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: 3m if within 2m of a boundary
  • Width: must not exceed half the width of the original dwelling

When Permitted Development Does Not Apply

  • Must not cover more than half the curtilage
  • Does not apply in front of the principal elevation
  • In designated areas (conservation areas, AONB, etc.), side extensions are not permitted development
  • Does not apply to flats or maisonettes

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval required for structural work, foundations, thermal insulation (Part L), ventilation, damp proofing, and any associated electrical or drainage work.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Stevenage building control or use an approved inspector.

How to Apply in Stevenage

If you need planning permission for your single-storey side extension, you can apply through Stevenage's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Stevenage Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Stevenage. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

The council can issue an enforcement notice requiring alterations or demolition. Side extensions are visible from public areas, making enforcement more likely if they breach planning rules. Indemnity insurance may be available for older unauthorised extensions but does not guarantee protection.

Frequently Asked Questions

Do I need planning permission for a single-storey side extension in Stevenage?
Generally permitted under Part 1, Class A. The extension must not exceed half the width of the original house and must be single storey. It should be subordinate in scale to the main dwelling. Note: Stevenage has 7 conservation areas (including Broadwater Conservation Area, Old Town High Street Conservation Area, Orchard Road Conservation Area) and 126 recorded Article 4 directions where permitted development rights may be restricted. Check with Stevenage planning department.
Does a single-storey side extension in Stevenage need building regulations?
Yes. Building Regulations approval required for structural work, foundations, thermal insulation (Part L), ventilation, damp proofing, and any associated electrical or drainage work. Contact Stevenage building control or an approved inspector for details.
How do I apply for planning permission in Stevenage?
You can apply for planning permission through Stevenage's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Stevenage?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Stevenage decided 90% of applications within the statutory or agreed time, and 81% of householder applications within 8 weeks.
What percentage of planning applications does Stevenage approve?
Stevenage granted 96% of the 253 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find a Builder in Stevenage

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Single-Storey Side Extension rules in nearby council areas

Other projects in Stevenage

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co