Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationNew Forest (South East)

Do I Need Planning Permission for a Tree Removal in New Forest?

Removing a tree from your property. Whether you need permission depends on whether the tree has a Tree Preservation Order (TPO) or is in a conservation area. Unprotected trees on your own land can generally be removed without permission.

Planning in New Forest

91%

of planning applications granted

97%

decided within the statutory or agreed time

80%

of householder applications decided within 8 weeks

In the year to December 2025, New Forest decided 912 planning applications. 549 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in New Forest

New Forest has 23 conservation areas. These include Ashlett Creek, Bickton, Breamore, Damerham, Eling, Fordingbridge. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

New Forest has 10 recorded Article 4 directions. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact New Forest planning department to check whether an Article 4 direction applies to your property.

Check with New Forest planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Tree Removal

Whether you need consent depends on the tree's protection status. Trees with a Tree Preservation Order (TPO) cannot be removed, topped, lopped, or uprooted without the council's consent. Trees in conservation areas require 6 weeks' written notice to the council before any work. Unprotected trees on your own land can generally be removed without permission.

Conditions

  • 1Trees with a TPO: must obtain consent from the council before any work (including pruning)
  • 2Trees in conservation areas: must give 6 weeks' written notice to the council (Section 211 notice)
  • 3Unprotected trees on your own land: no permission normally needed
  • 4Dead, dying, or dangerous trees: TPO consent is still technically required but councils usually grant it
  • 5Felling licence from the Forestry Commission may be needed if removing more than 5 cubic metres of timber in a calendar quarter

Size and Dimension Limits

  • Not applicable; the issue is the tree's protection status

When Permitted Development Does Not Apply

  • Breaching a TPO is a criminal offence with fines up to £20,000 (magistrates' court) or unlimited (Crown Court)
  • Working on a tree in a conservation area without notice is an offence
  • Neighbours' trees: you may trim branches overhanging your property but must return the cuttings
  • High hedges: covered by separate legislation (Anti-social Behaviour Act 2003, Part 8)

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to tree removal. However, if removing a tree near a building on clay soil, the ground may swell (heave), potentially affecting foundations. A structural engineer or arboriculturist should advise if the tree is within influencing distance of a building.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact New Forest building control or use an approved inspector.

How to Apply in New Forest

If you need planning permission for your tree removal, you can apply through New Forest's planning department or via the national Planning Portal.

Timeline:TPO applications: 8 weeks. Conservation area notices: 6 weeks. Unprotected trees: no timeline.
Cost:TPO applications and conservation area notices are free of charge.
Visit New Forest Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from New Forest. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

High risk for protected trees. Breaching a TPO is a criminal offence with significant fines. The council can also require you to plant a replacement tree. Work on trees in conservation areas without notice is also an offence, and the council can impose a TPO retrospectively.

Frequently Asked Questions

Do I need planning permission for a tree removal in New Forest?
Whether you need consent depends on the tree's protection status. Trees with a Tree Preservation Order (TPO) cannot be removed, topped, lopped, or uprooted without the council's consent. Trees in conservation areas require 6 weeks' written notice to the council before any work. Unprotected trees on your own land can generally be removed without permission. Note: New Forest has 23 conservation areas (including Ashlett Creek, Bickton, Breamore) and 10 recorded Article 4 directions where permitted development rights may be restricted. Check with New Forest planning department.
Does a tree removal in New Forest need building regulations?
Building regulations approval is not usually required for a tree removal. Building Regulations do not apply to tree removal. However, if removing a tree near a building on clay soil, the ground may swell (heave), potentially affecting foundations. A structural engineer or arboriculturist should advise if the tree is within influencing distance of a building.
How do I apply for planning permission in New Forest?
You can apply for planning permission through New Forest's planning department or via the national Planning Portal. TPO applications and conservation area notices are free of charge.. TPO applications: 8 weeks. Conservation area notices: 6 weeks. Unprotected trees: no timeline..
How long does planning permission take in New Forest?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, New Forest decided 97% of applications within the statutory or agreed time, and 80% of householder applications within 8 weeks.
What percentage of planning applications does New Forest approve?
New Forest granted 91% of the 912 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find a Tree Surgeon in New Forest

Browse local tree surgeons on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Tree Removal rules in nearby council areas

Other projects in New Forest