Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationLewes (South East)

Do I Need Planning Permission for a Tree Removal in Lewes?

Removing a tree from your property. Whether you need permission depends on whether the tree has a Tree Preservation Order (TPO) or is in a conservation area. Unprotected trees on your own land can generally be removed without permission.

Planning in Lewes

91%

of planning applications granted

78%

decided within the statutory or agreed time

65%

of householder applications decided within 8 weeks

In the year to December 2025, Lewes decided 411 planning applications. 238 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Lewes

Lewes has 28 conservation areas. These include Barcombe, Barcombe Cross, Chailey (St George's), Chailey Green, Denton, Ditchling. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Lewes has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Lewes planning department to check whether an Article 4 direction applies to your property.

Check with Lewes planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Tree Removal

Whether you need consent depends on the tree's protection status. Trees with a Tree Preservation Order (TPO) cannot be removed, topped, lopped, or uprooted without the council's consent. Trees in conservation areas require 6 weeks' written notice to the council before any work. Unprotected trees on your own land can generally be removed without permission.

Conditions

  • 1Trees with a TPO: must obtain consent from the council before any work (including pruning)
  • 2Trees in conservation areas: must give 6 weeks' written notice to the council (Section 211 notice)
  • 3Unprotected trees on your own land: no permission normally needed
  • 4Dead, dying, or dangerous trees: TPO consent is still technically required but councils usually grant it
  • 5Felling licence from the Forestry Commission may be needed if removing more than 5 cubic metres of timber in a calendar quarter

Size and Dimension Limits

  • Not applicable; the issue is the tree's protection status

When Permitted Development Does Not Apply

  • Breaching a TPO is a criminal offence with fines up to £20,000 (magistrates' court) or unlimited (Crown Court)
  • Working on a tree in a conservation area without notice is an offence
  • Neighbours' trees: you may trim branches overhanging your property but must return the cuttings
  • High hedges: covered by separate legislation (Anti-social Behaviour Act 2003, Part 8)

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to tree removal. However, if removing a tree near a building on clay soil, the ground may swell (heave), potentially affecting foundations. A structural engineer or arboriculturist should advise if the tree is within influencing distance of a building.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Lewes building control or use an approved inspector.

How to Apply in Lewes

If you need planning permission for your tree removal, you can apply through Lewes's planning department or via the national Planning Portal.

Timeline:TPO applications: 8 weeks. Conservation area notices: 6 weeks. Unprotected trees: no timeline.
Cost:TPO applications and conservation area notices are free of charge.
Visit Lewes Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Lewes. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

High risk for protected trees. Breaching a TPO is a criminal offence with significant fines. The council can also require you to plant a replacement tree. Work on trees in conservation areas without notice is also an offence, and the council can impose a TPO retrospectively.

Frequently Asked Questions

Do I need planning permission for a tree removal in Lewes?
Whether you need consent depends on the tree's protection status. Trees with a Tree Preservation Order (TPO) cannot be removed, topped, lopped, or uprooted without the council's consent. Trees in conservation areas require 6 weeks' written notice to the council before any work. Unprotected trees on your own land can generally be removed without permission. Note: Lewes has 28 conservation areas (including Barcombe, Barcombe Cross, Chailey (St George's)) where permitted development rights may be restricted. Check with Lewes planning department.
Does a tree removal in Lewes need building regulations?
Building regulations approval is not usually required for a tree removal. Building Regulations do not apply to tree removal. However, if removing a tree near a building on clay soil, the ground may swell (heave), potentially affecting foundations. A structural engineer or arboriculturist should advise if the tree is within influencing distance of a building.
How do I apply for planning permission in Lewes?
You can apply for planning permission through Lewes's planning department or via the national Planning Portal. TPO applications and conservation area notices are free of charge.. TPO applications: 8 weeks. Conservation area notices: 6 weeks. Unprotected trees: no timeline..
How long does planning permission take in Lewes?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Lewes decided 78% of applications within the statutory or agreed time, and 65% of householder applications within 8 weeks.
What percentage of planning applications does Lewes approve?
Lewes granted 91% of the 411 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Tree Surgeon in Lewes

Browse local tree surgeons on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Tree Removal rules in nearby council areas

Other projects in Lewes