This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.
Do I Need Planning Permission for a Solar Panels in Spelthorne?
Installing solar photovoltaic (PV) panels or solar thermal panels on your roof or within your property's grounds. Solar panels have specific permitted development rights under Part 14 of the GPDO.
Important: Additional Restrictions May Apply in Spelthorne
Spelthorne has conservation areas. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.
Check with Spelthorne planning department before starting work to confirm whether your property is affected by any special designations.
Permitted Development Rules for a Solar Panels
Generally permitted under Part 14, Class A (roof-mounted) of the GPDO. Solar panels on a roof are PD provided they do not protrude more than 200mm beyond the roof plane and do not exceed the highest part of the roof (excluding the chimney). Standalone panels in the garden are PD under Part 14, Class B with additional conditions.
Conditions
- 1Must not protrude more than 200mm beyond the roof plane
- 2Must not be higher than the highest part of the roof (excluding the chimney)
- 3Must not be installed on a wall or roof slope forming the principal elevation and fronting a highway (in designated areas)
- 4Panels must be removed when no longer needed for energy generation
- 5Standalone ground-mounted panels: must not face a highway and must not exceed 4m in height or 9 square metres in area
Size and Dimension Limits
- Roof-mounted: must not protrude more than 200mm from roof plane
- Must not exceed highest part of roof (excluding chimney)
- Ground-mounted: maximum 4m height, 9 square metres area
When Permitted Development Does Not Apply
- Listed buildings require listed building consent
- In conservation areas, AONB, National Parks, etc., panels on principal or highway-facing elevations are not PD
- Standalone panels must not be within 5m of the boundary of the curtilage in designated areas
- Flat roof installations must not exceed 1m above the highest point of the flat roof
What About Building Regulations?
Building regulations approval is not usually required
Building Regulations do not normally apply to solar panel installation on an existing roof, provided the roof structure can support the additional load. If structural alterations to the roof are needed, Building Regulations may apply. Electrical work must comply with Part P and should be carried out by an MCS-certified installer to qualify for Smart Export Guarantee (SEG) payments.
Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Spelthorne building control or use an approved inspector.
How to Apply in Spelthorne
If you need planning permission for your solar panels, you can apply through Spelthorne's planning department or via the national Planning Portal.
If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Spelthorne. This provides proof that your project does not need planning permission, which can be helpful when selling your property.
What Happens If I Build Without Permission?
Low risk for standard roof-mounted panels on non-listed, non-designated-area properties. In conservation areas or on listed buildings, enforcement can require removal of panels installed without consent.
Find a Solar Panel Installer in Spelthorne
Browse local solar panel installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.