This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentLichfield (West Midlands)

Do I Need Planning Permission for Solar Panels in Lichfield?

Installing solar photovoltaic (PV) panels or solar thermal panels on your roof or within your property's grounds. Solar panels have specific permitted development rights under Part 14 of the GPDO.

Planning in Lichfield

80%

of planning applications granted

97%

decided within the statutory or agreed time

96%

of householder applications decided within 8 weeks

In the year to December 2025, Lichfield decided 718 planning applications. 375 of these were householder projects such as extensions, loft conversions and outbuildings, of which 82% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Lichfield

Lichfield has 21 conservation areas. These include Alrewas, Clifton Campville, Colton, Elford, Fazeley and Bonehill, Fradley Junction. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Lichfield has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Lichfield planning department to check whether an Article 4 direction applies to your property.

Check with Lichfield planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for Solar Panels

Generally permitted under Part 14, Class A (roof-mounted) of the GPDO. Solar panels on a roof are PD provided they do not protrude more than 200mm beyond the roof plane and do not exceed the highest part of the roof (excluding the chimney). Standalone panels in the garden are PD under Part 14, Class B with additional conditions.

Conditions

  • 1Must not protrude more than 200mm beyond the roof plane
  • 2Must not be higher than the highest part of the roof (excluding the chimney)
  • 3Must not be installed on a wall or roof slope forming the principal elevation and fronting a highway (in designated areas)
  • 4Panels must be removed when no longer needed for energy generation
  • 5Standalone ground-mounted panels: must not face a highway and must not exceed 4m in height or 9 square metres in area

Size and Dimension Limits

  • Roof-mounted: must not protrude more than 200mm from roof plane
  • Must not exceed highest part of roof (excluding chimney)
  • Ground-mounted: maximum 4m height, 9 square metres area

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • In conservation areas, AONB, National Parks, etc., panels on principal or highway-facing elevations are not PD
  • Standalone panels must not be within 5m of the boundary of the curtilage in designated areas
  • Flat roof installations must not exceed 1m above the highest point of the flat roof

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not normally apply to solar panel installation on an existing roof, provided the roof structure can support the additional load. If structural alterations to the roof are needed, Building Regulations may apply. Electrical work must comply with Part P and should be carried out by an MCS-certified installer to qualify for Smart Export Guarantee (SEG) payments.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Lichfield building control or use an approved inspector.

How to Apply in Lichfield

If you need planning permission for your solar panels, you can apply through Lichfield's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Lichfield Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Lichfield. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for standard roof-mounted panels on non-listed, non-designated-area properties. In conservation areas or on listed buildings, enforcement can require removal of panels installed without consent.

Frequently Asked Questions

Do I need planning permission for solar panels in Lichfield?
Generally permitted under Part 14, Class A (roof-mounted) of the GPDO. Solar panels on a roof are PD provided they do not protrude more than 200mm beyond the roof plane and do not exceed the highest part of the roof (excluding the chimney). Standalone panels in the garden are PD under Part 14, Class B with additional conditions. Note: Lichfield has 21 conservation areas (including Alrewas, Clifton Campville, Colton) where permitted development rights may be restricted. Check with Lichfield planning department.
Does solar panels in Lichfield need building regulations?
Building regulations approval is not usually required for solar panels. Building Regulations do not normally apply to solar panel installation on an existing roof, provided the roof structure can support the additional load. If structural alterations to the roof are needed, Building Regulations may apply. Electrical work must comply with Part P and should be carried out by an MCS-certified installer to qualify for Smart Export Guarantee (SEG) payments.
How do I apply for planning permission in Lichfield?
You can apply for planning permission through Lichfield's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Lichfield?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Lichfield decided 97% of applications within the statutory or agreed time, and 96% of householder applications within 8 weeks.
What percentage of planning applications does Lichfield approve?
Lichfield granted 80% of the 718 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 82%.

Find a Solar Panel Installer in Lichfield

Browse local solar panel installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Solar Panels rules in nearby council areas

Other projects in Lichfield