This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentSandwell (West Midlands)

Do I Need Planning Permission for Solar Panels in Sandwell?

Installing solar photovoltaic (PV) panels or solar thermal panels on your roof or within your property's grounds. Solar panels have specific permitted development rights under Part 14 of the GPDO.

Planning in Sandwell

88%

of planning applications granted

98%

decided within the statutory or agreed time

72%

of householder applications decided within 8 weeks

In the year to December 2025, Sandwell decided 935 planning applications. 585 of these were householder projects such as extensions, loft conversions and outbuildings, of which 90% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Sandwell

Sandwell has 9 conservation areas. These include Oldbury Church Square, Rowley Regis Windmill End (Warrens Hall Park), Smethwick Cape Hill, Smethwick High Street and Crocketts Lane, Smethwick Summit Galton Valley, Smethwick Town Centre High Street. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Sandwell has 3 recorded Article 4 directions. These include High Street West Bromwich; High Street and Crocketts Lane; Portway Hill. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Sandwell planning department to check whether an Article 4 direction applies to your property.

Check with Sandwell planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for Solar Panels

Generally permitted under Part 14, Class A (roof-mounted) of the GPDO. Solar panels on a roof are PD provided they do not protrude more than 200mm beyond the roof plane and do not exceed the highest part of the roof (excluding the chimney). Standalone panels in the garden are PD under Part 14, Class B with additional conditions.

Conditions

  • 1Must not protrude more than 200mm beyond the roof plane
  • 2Must not be higher than the highest part of the roof (excluding the chimney)
  • 3Must not be installed on a wall or roof slope forming the principal elevation and fronting a highway (in designated areas)
  • 4Panels must be removed when no longer needed for energy generation
  • 5Standalone ground-mounted panels: must not face a highway and must not exceed 4m in height or 9 square metres in area

Size and Dimension Limits

  • Roof-mounted: must not protrude more than 200mm from roof plane
  • Must not exceed highest part of roof (excluding chimney)
  • Ground-mounted: maximum 4m height, 9 square metres area

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • In conservation areas, AONB, National Parks, etc., panels on principal or highway-facing elevations are not PD
  • Standalone panels must not be within 5m of the boundary of the curtilage in designated areas
  • Flat roof installations must not exceed 1m above the highest point of the flat roof

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not normally apply to solar panel installation on an existing roof, provided the roof structure can support the additional load. If structural alterations to the roof are needed, Building Regulations may apply. Electrical work must comply with Part P and should be carried out by an MCS-certified installer to qualify for Smart Export Guarantee (SEG) payments.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Sandwell building control or use an approved inspector.

How to Apply in Sandwell

If you need planning permission for your solar panels, you can apply through Sandwell's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Sandwell Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Sandwell. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for standard roof-mounted panels on non-listed, non-designated-area properties. In conservation areas or on listed buildings, enforcement can require removal of panels installed without consent.

Frequently Asked Questions

Do I need planning permission for solar panels in Sandwell?
Generally permitted under Part 14, Class A (roof-mounted) of the GPDO. Solar panels on a roof are PD provided they do not protrude more than 200mm beyond the roof plane and do not exceed the highest part of the roof (excluding the chimney). Standalone panels in the garden are PD under Part 14, Class B with additional conditions. Note: Sandwell has 9 conservation areas (including Oldbury Church Square, Rowley Regis Windmill End (Warrens Hall Park), Smethwick Cape Hill) and 3 recorded Article 4 directions where permitted development rights may be restricted. Check with Sandwell planning department.
Does solar panels in Sandwell need building regulations?
Building regulations approval is not usually required for solar panels. Building Regulations do not normally apply to solar panel installation on an existing roof, provided the roof structure can support the additional load. If structural alterations to the roof are needed, Building Regulations may apply. Electrical work must comply with Part P and should be carried out by an MCS-certified installer to qualify for Smart Export Guarantee (SEG) payments.
How do I apply for planning permission in Sandwell?
You can apply for planning permission through Sandwell's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Sandwell?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Sandwell decided 98% of applications within the statutory or agreed time, and 72% of householder applications within 8 weeks.
What percentage of planning applications does Sandwell approve?
Sandwell granted 88% of the 935 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 90%.