Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentHinckley and Bosworth (East Midlands)

Do I Need Planning Permission for Solar Panels in Hinckley and Bosworth?

Installing solar photovoltaic (PV) panels or solar thermal panels on your roof or within your property's grounds. Solar panels have specific permitted development rights under Part 14 of the GPDO.

Planning in Hinckley and Bosworth

88%

of planning applications granted

72%

decided within the statutory or agreed time

45%

of householder applications decided within 8 weeks

In the year to December 2025, Hinckley and Bosworth decided 484 planning applications. 264 of these were householder projects such as extensions, loft conversions and outbuildings, of which 94% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Hinckley and Bosworth

Hinckley and Bosworth has 28 conservation areas. These include Ashby-de-la-Zouch Canal, Barwell A, Barwell B, Bilstone, Burbage, Cadeby. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Hinckley and Bosworth planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for Solar Panels

Generally permitted under Part 14, Class A (roof-mounted) of the GPDO. Solar panels on a roof are PD provided they do not protrude more than 200mm beyond the roof plane and do not exceed the highest part of the roof (excluding the chimney). Standalone panels in the garden are PD under Part 14, Class B with additional conditions.

Conditions

  • 1Must not protrude more than 200mm beyond the roof plane
  • 2Must not be higher than the highest part of the roof (excluding the chimney)
  • 3Must not be installed on a wall or roof slope forming the principal elevation and fronting a highway (in designated areas)
  • 4Panels must be removed when no longer needed for energy generation
  • 5Standalone ground-mounted panels: must not face a highway and must not exceed 4m in height or 9 square metres in area

Size and Dimension Limits

  • Roof-mounted: must not protrude more than 200mm from roof plane
  • Must not exceed highest part of roof (excluding chimney)
  • Ground-mounted: maximum 4m height, 9 square metres area

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • In conservation areas, AONB, National Parks, etc., panels on principal or highway-facing elevations are not PD
  • Standalone panels must not be within 5m of the boundary of the curtilage in designated areas
  • Flat roof installations must not exceed 1m above the highest point of the flat roof

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not normally apply to solar panel installation on an existing roof, provided the roof structure can support the additional load. If structural alterations to the roof are needed, Building Regulations may apply. Electrical work must comply with Part P and should be carried out by an MCS-certified installer to qualify for Smart Export Guarantee (SEG) payments.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Hinckley and Bosworth building control or use an approved inspector.

How to Apply in Hinckley and Bosworth

If you need planning permission for your solar panels, you can apply through Hinckley and Bosworth's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Hinckley and Bosworth Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Hinckley and Bosworth. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for standard roof-mounted panels on non-listed, non-designated-area properties. In conservation areas or on listed buildings, enforcement can require removal of panels installed without consent.

Frequently Asked Questions

Do I need planning permission for solar panels in Hinckley and Bosworth?
Generally permitted under Part 14, Class A (roof-mounted) of the GPDO. Solar panels on a roof are PD provided they do not protrude more than 200mm beyond the roof plane and do not exceed the highest part of the roof (excluding the chimney). Standalone panels in the garden are PD under Part 14, Class B with additional conditions. Note: Hinckley and Bosworth has 28 conservation areas (including Ashby-de-la-Zouch Canal, Barwell A, Barwell B) where permitted development rights may be restricted. Check with Hinckley and Bosworth planning department.
Does solar panels in Hinckley and Bosworth need building regulations?
Building regulations approval is not usually required for solar panels. Building Regulations do not normally apply to solar panel installation on an existing roof, provided the roof structure can support the additional load. If structural alterations to the roof are needed, Building Regulations may apply. Electrical work must comply with Part P and should be carried out by an MCS-certified installer to qualify for Smart Export Guarantee (SEG) payments.
How do I apply for planning permission in Hinckley and Bosworth?
You can apply for planning permission through Hinckley and Bosworth's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Hinckley and Bosworth?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Hinckley and Bosworth decided 72% of applications within the statutory or agreed time, and 45% of householder applications within 8 weeks.
What percentage of planning applications does Hinckley and Bosworth approve?
Hinckley and Bosworth granted 88% of the 484 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 94%.

Find a Solar Panel Installer in Hinckley and Bosworth

Browse local solar panel installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Solar Panels rules in nearby council areas

Other projects in Hinckley and Bosworth