Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentHinckley and Bosworth (East Midlands)

Do I Need Planning Permission for a Ground Source Heat Pump in Hinckley and Bosworth?

Installing a ground source heat pump (GSHP) that extracts heat from the ground via buried pipes (horizontal trenches or vertical boreholes). GSHPs have specific permitted development rights under Part 14.

Planning in Hinckley and Bosworth

88%

of planning applications granted

72%

decided within the statutory or agreed time

45%

of householder applications decided within 8 weeks

In the year to December 2025, Hinckley and Bosworth decided 484 planning applications. 264 of these were householder projects such as extensions, loft conversions and outbuildings, of which 94% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Hinckley and Bosworth

Hinckley and Bosworth has 28 conservation areas. These include Ashby-de-la-Zouch Canal, Barwell A, Barwell B, Bilstone, Burbage, Cadeby. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Hinckley and Bosworth planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Ground Source Heat Pump

Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation.

Conditions

  • 1Must be installed within the curtilage of the dwelling
  • 2The land surface must be reinstated to its previous condition after installation
  • 3Must not be on land within the curtilage of a listed building
  • 4Equipment above ground (pumps, manifolds) must comply with standard outbuilding PD rules if in a separate enclosure

Size and Dimension Limits

  • No specific dimensions for the underground pipework
  • Above-ground equipment: follow outbuilding rules if housed in a separate structure

When Permitted Development Does Not Apply

  • Not PD within the curtilage of a listed building
  • Vertical boreholes may require an environmental permit from the Environment Agency depending on depth and local geology
  • Ground conditions must be suitable (assessed by an MCS-certified installer)
  • The ground must be reinstated afterwards

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Hinckley and Bosworth building control or use an approved inspector.

How to Apply in Hinckley and Bosworth

If you need planning permission for your ground source heat pump, you can apply through Hinckley and Bosworth's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Hinckley and Bosworth Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Hinckley and Bosworth. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low planning enforcement risk as the installation is almost entirely underground and invisible once complete. The main regulatory risks are environmental (contamination of groundwater) rather than planning.

Frequently Asked Questions

Do I need planning permission for a ground source heat pump in Hinckley and Bosworth?
Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation. Note: Hinckley and Bosworth has 28 conservation areas (including Ashby-de-la-Zouch Canal, Barwell A, Barwell B) where permitted development rights may be restricted. Check with Hinckley and Bosworth planning department.
Does a ground source heat pump in Hinckley and Bosworth need building regulations?
Yes. Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant. Contact Hinckley and Bosworth building control or an approved inspector for details.
How do I apply for planning permission in Hinckley and Bosworth?
You can apply for planning permission through Hinckley and Bosworth's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Hinckley and Bosworth?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Hinckley and Bosworth decided 72% of applications within the statutory or agreed time, and 45% of householder applications within 8 weeks.
What percentage of planning applications does Hinckley and Bosworth approve?
Hinckley and Bosworth granted 88% of the 484 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 94%.

Find a Heat Pump Installer in Hinckley and Bosworth

Browse local heat pump installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Ground Source Heat Pump rules in nearby council areas

Other projects in Hinckley and Bosworth