Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentAshfield (East Midlands)

Do I Need Planning Permission for a Single-Storey Side Extension in Ashfield?

A single-storey extension built to the side of your property, often used to add a utility room, downstairs WC, or to widen a kitchen.

Planning in Ashfield

86%

of planning applications granted

83%

decided within the statutory or agreed time

72%

of householder applications decided within 8 weeks

In the year to December 2025, Ashfield decided 414 planning applications. 183 of these were householder projects such as extensions, loft conversions and outbuildings, of which 88% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Ashfield

Ashfield has 5 conservation areas. These include Annesley, Kirkby Cross, Lower Bagthorpe, Sutton in Ashfield Church and Market Place, Teversal. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Ashfield planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Single-Storey Side Extension

Generally permitted under Part 1, Class A. The extension must not exceed half the width of the original house and must be single storey. It should be subordinate in scale to the main dwelling.

Conditions

  • 1Must not exceed half the width of the original house
  • 2Maximum height of 4m
  • 3Eaves height maximum 3m if within 2m of a boundary
  • 4Must be set back from the principal elevation or side elevation fronting a highway
  • 5Materials must be similar in appearance to the existing house

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: 3m if within 2m of a boundary
  • Width: must not exceed half the width of the original dwelling

When Permitted Development Does Not Apply

  • Must not cover more than half the curtilage
  • Does not apply in front of the principal elevation
  • In designated areas (conservation areas, AONB, etc.), side extensions are not permitted development
  • Does not apply to flats or maisonettes

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval required for structural work, foundations, thermal insulation (Part L), ventilation, damp proofing, and any associated electrical or drainage work.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Ashfield building control or use an approved inspector.

How to Apply in Ashfield

If you need planning permission for your single-storey side extension, you can apply through Ashfield's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Ashfield Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Ashfield. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

The council can issue an enforcement notice requiring alterations or demolition. Side extensions are visible from public areas, making enforcement more likely if they breach planning rules. Indemnity insurance may be available for older unauthorised extensions but does not guarantee protection.

Frequently Asked Questions

Do I need planning permission for a single-storey side extension in Ashfield?
Generally permitted under Part 1, Class A. The extension must not exceed half the width of the original house and must be single storey. It should be subordinate in scale to the main dwelling. Note: Ashfield has 5 conservation areas (including Annesley, Kirkby Cross, Lower Bagthorpe) where permitted development rights may be restricted. Check with Ashfield planning department.
Does a single-storey side extension in Ashfield need building regulations?
Yes. Building Regulations approval required for structural work, foundations, thermal insulation (Part L), ventilation, damp proofing, and any associated electrical or drainage work. Contact Ashfield building control or an approved inspector for details.
How do I apply for planning permission in Ashfield?
You can apply for planning permission through Ashfield's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Ashfield?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Ashfield decided 83% of applications within the statutory or agreed time, and 72% of householder applications within 8 weeks.
What percentage of planning applications does Ashfield approve?
Ashfield granted 86% of the 414 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 88%.

Find a Builder in Ashfield

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Single-Storey Side Extension rules in nearby council areas

Other projects in Ashfield