This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentNorth Kesteven (East Midlands)

Do I Need Planning Permission for a Single-Storey Rear Extension in North Kesteven?

A single-storey extension built to the rear of your home, typically used to enlarge a kitchen, dining room, or living space. One of the most common home improvement projects in the UK.

Planning in North Kesteven

97%

of planning applications granted

96%

decided within the statutory or agreed time

71%

of householder applications decided within 8 weeks

In the year to December 2025, North Kesteven decided 637 planning applications. 307 of these were householder projects such as extensions, loft conversions and outbuildings, of which 99% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in North Kesteven

North Kesteven has 38 conservation areas. These include Aswarby, Bassingham, Beckingham, Billinghay, Blankney, Bloxholm. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with North Kesteven planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Single-Storey Rear Extension

Generally permitted under Part 1, Class A of the GPDO. Standard permitted development allows a maximum projection of 3m (semi-detached or terraced) or 4m (detached). Under the Larger Home Extension scheme (prior approval), this increases to 6m and 8m respectively.

Conditions

  • 1Must be to the rear of the original dwelling
  • 2Must not extend beyond the rear wall of the original house by more than 3m (semi/terraced) or 4m (detached) under standard PD
  • 3Under prior approval (Larger Home Extension), maximum depth increases to 6m (semi/terraced) or 8m (detached)
  • 4Materials must be similar in appearance to the existing dwelling
  • 5Extension must not be built on land forward of the principal elevation fronting a highway

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: maximum 3m if within 2m of a boundary
  • Depth from original rear wall: 3m (semi/terraced) or 4m (detached) under standard PD; 6m or 8m under prior approval

When Permitted Development Does Not Apply

  • Must not cover more than half the area of land around the original house (curtilage)
  • Does not apply to flats or maisonettes
  • Restricted or removed in conservation areas, AONB, National Parks, the Broads, and World Heritage Sites
  • Listed building consent required separately for listed buildings
  • Article 4 directions may remove these rights locally

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is required covering structural stability, foundations, damp proofing, insulation (Part L), ventilation, fire safety, drainage, and electrical work. Building control will inspect at key stages.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact North Kesteven building control or use an approved inspector.

How to Apply in North Kesteven

If you need planning permission for your single-storey rear extension, you can apply through North Kesteven's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications. Prior approval (Larger Home Extension) takes 42 days from the date the LPA receives the application.
Cost:£258
Visit North Kesteven Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from North Kesteven. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Building without permission when it is required can result in an enforcement notice from the council, requiring you to alter or demolish the extension. The council has up to 4 years to take enforcement action for building works. Unauthorised extensions can also cause problems when selling your property, as solicitors will check for planning compliance.

Frequently Asked Questions

Do I need planning permission for a single-storey rear extension in North Kesteven?
Generally permitted under Part 1, Class A of the GPDO. Standard permitted development allows a maximum projection of 3m (semi-detached or terraced) or 4m (detached). Under the Larger Home Extension scheme (prior approval), this increases to 6m and 8m respectively. Note: North Kesteven has 38 conservation areas (including Aswarby, Bassingham, Beckingham) where permitted development rights may be restricted. Check with North Kesteven planning department.
Does a single-storey rear extension in North Kesteven need building regulations?
Yes. Building Regulations approval is required covering structural stability, foundations, damp proofing, insulation (Part L), ventilation, fire safety, drainage, and electrical work. Building control will inspect at key stages. Contact North Kesteven building control or an approved inspector for details.
How do I apply for planning permission in North Kesteven?
You can apply for planning permission through North Kesteven's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications. Prior approval (Larger Home Extension) takes 42 days from the date the LPA receives the application..
How long does planning permission take in North Kesteven?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, North Kesteven decided 96% of applications within the statutory or agreed time, and 71% of householder applications within 8 weeks.
What percentage of planning applications does North Kesteven approve?
North Kesteven granted 97% of the 637 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 99%.

Find a Builder in North Kesteven

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.