Do I Need Planning Permission for a Single-Storey Rear Extension in Liverpool?

A single-storey extension built to the rear of your home, typically used to enlarge a kitchen, dining room, or living space. One of the most common home improvement projects in the UK.

Planning in Liverpool

84%

of planning applications granted

87%

decided within the statutory or agreed time

61%

of householder applications decided within 8 weeks

In the year to December 2025, Liverpool decided 1,323 planning applications. 526 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Liverpool

Liverpool has 36 conservation areas. These include Albert Dock, Canning Street, Castle Street, Childwall Abbey, Derwent Square, Duke Street. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Liverpool has Article 4 directions in force. These include Bowling Green, Barlows Lane, Croft Lane; Bramley Moore Dock, Regent Road, Liverpool; Calder House, Cromptons Lane, Liverpool; Charnley Drive. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Liverpool planning department to check whether an Article 4 direction applies to your property.

Check with Liverpool planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Single-Storey Rear Extension

Generally permitted under Part 1, Class A of the GPDO. Standard permitted development allows a maximum projection of 3m (semi-detached or terraced) or 4m (detached). Under the Larger Home Extension scheme (prior approval), this increases to 6m and 8m respectively.

Conditions

  • 1Must be to the rear of the original dwelling
  • 2Must not extend beyond the rear wall of the original house by more than 3m (semi/terraced) or 4m (detached) under standard PD
  • 3Under prior approval (Larger Home Extension), maximum depth increases to 6m (semi/terraced) or 8m (detached)
  • 4Materials must be similar in appearance to the existing dwelling
  • 5Extension must not be built on land forward of the principal elevation fronting a highway

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: maximum 3m if within 2m of a boundary
  • Depth from original rear wall: 3m (semi/terraced) or 4m (detached) under standard PD; 6m or 8m under prior approval

When Permitted Development Does Not Apply

  • Must not cover more than half the area of land around the original house (curtilage)
  • Does not apply to flats or maisonettes
  • Restricted or removed in conservation areas, AONB, National Parks, the Broads, and World Heritage Sites
  • Listed building consent required separately for listed buildings
  • Article 4 directions may remove these rights locally

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is required covering structural stability, foundations, damp proofing, insulation (Part L), ventilation, fire safety, drainage, and electrical work. Building control will inspect at key stages.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Liverpool building control or use an approved inspector.

How to Apply in Liverpool

If you need planning permission for your single-storey rear extension, you can apply through Liverpool's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications. Prior approval (Larger Home Extension) takes 42 days from the date the LPA receives the application.
Cost:£258
Visit Liverpool Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Liverpool. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Building without permission when it is required can result in an enforcement notice from the council, requiring you to alter or demolish the extension. The council has up to 4 years to take enforcement action for building works. Unauthorised extensions can also cause problems when selling your property, as solicitors will check for planning compliance.

Frequently Asked Questions

Do I need planning permission for a single-storey rear extension in Liverpool?
Generally permitted under Part 1, Class A of the GPDO. Standard permitted development allows a maximum projection of 3m (semi-detached or terraced) or 4m (detached). Under the Larger Home Extension scheme (prior approval), this increases to 6m and 8m respectively. Note: Liverpool has 36 conservation areas (including Albert Dock, Canning Street, Castle Street) and Article 4 directions in force where permitted development rights may be restricted. Check with Liverpool planning department.
Does a single-storey rear extension in Liverpool need building regulations?
Yes. Building Regulations approval is required covering structural stability, foundations, damp proofing, insulation (Part L), ventilation, fire safety, drainage, and electrical work. Building control will inspect at key stages. Contact Liverpool building control or an approved inspector for details.
How do I apply for planning permission in Liverpool?
You can apply for planning permission through Liverpool's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications. Prior approval (Larger Home Extension) takes 42 days from the date the LPA receives the application..
How long does planning permission take in Liverpool?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Liverpool decided 87% of applications within the statutory or agreed time, and 61% of householder applications within 8 weeks.
What percentage of planning applications does Liverpool approve?
Liverpool granted 84% of the 1,323 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.

Find a Builder in Liverpool