This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentEast Devon (South West)

Do I Need Planning Permission for a Single-Storey Rear Extension in East Devon?

A single-storey extension built to the rear of your home, typically used to enlarge a kitchen, dining room, or living space. One of the most common home improvement projects in the UK.

Planning in East Devon

89%

of planning applications granted

74%

decided within the statutory or agreed time

69%

of householder applications decided within 8 weeks

In the year to December 2025, East Devon decided 1,323 planning applications. 622 of these were householder projects such as extensions, loft conversions and outbuildings, of which 93% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in East Devon

East Devon has 32 conservation areas. These include Axminster, Beer, Brampford Speke, Broadclyst, Broadhembury, Budleigh Salterton. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with East Devon planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Single-Storey Rear Extension

Generally permitted under Part 1, Class A of the GPDO. Standard permitted development allows a maximum projection of 3m (semi-detached or terraced) or 4m (detached). Under the Larger Home Extension scheme (prior approval), this increases to 6m and 8m respectively.

Conditions

  • 1Must be to the rear of the original dwelling
  • 2Must not extend beyond the rear wall of the original house by more than 3m (semi/terraced) or 4m (detached) under standard PD
  • 3Under prior approval (Larger Home Extension), maximum depth increases to 6m (semi/terraced) or 8m (detached)
  • 4Materials must be similar in appearance to the existing dwelling
  • 5Extension must not be built on land forward of the principal elevation fronting a highway

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: maximum 3m if within 2m of a boundary
  • Depth from original rear wall: 3m (semi/terraced) or 4m (detached) under standard PD; 6m or 8m under prior approval

When Permitted Development Does Not Apply

  • Must not cover more than half the area of land around the original house (curtilage)
  • Does not apply to flats or maisonettes
  • Restricted or removed in conservation areas, AONB, National Parks, the Broads, and World Heritage Sites
  • Listed building consent required separately for listed buildings
  • Article 4 directions may remove these rights locally

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is required covering structural stability, foundations, damp proofing, insulation (Part L), ventilation, fire safety, drainage, and electrical work. Building control will inspect at key stages.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact East Devon building control or use an approved inspector.

How to Apply in East Devon

If you need planning permission for your single-storey rear extension, you can apply through East Devon's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications. Prior approval (Larger Home Extension) takes 42 days from the date the LPA receives the application.
Cost:£258
Visit East Devon Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from East Devon. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Building without permission when it is required can result in an enforcement notice from the council, requiring you to alter or demolish the extension. The council has up to 4 years to take enforcement action for building works. Unauthorised extensions can also cause problems when selling your property, as solicitors will check for planning compliance.

Frequently Asked Questions

Do I need planning permission for a single-storey rear extension in East Devon?
Generally permitted under Part 1, Class A of the GPDO. Standard permitted development allows a maximum projection of 3m (semi-detached or terraced) or 4m (detached). Under the Larger Home Extension scheme (prior approval), this increases to 6m and 8m respectively. Note: East Devon has 32 conservation areas (including Axminster, Beer, Brampford Speke) where permitted development rights may be restricted. Check with East Devon planning department.
Does a single-storey rear extension in East Devon need building regulations?
Yes. Building Regulations approval is required covering structural stability, foundations, damp proofing, insulation (Part L), ventilation, fire safety, drainage, and electrical work. Building control will inspect at key stages. Contact East Devon building control or an approved inspector for details.
How do I apply for planning permission in East Devon?
You can apply for planning permission through East Devon's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications. Prior approval (Larger Home Extension) takes 42 days from the date the LPA receives the application..
How long does planning permission take in East Devon?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, East Devon decided 74% of applications within the statutory or agreed time, and 69% of householder applications within 8 weeks.
What percentage of planning applications does East Devon approve?
East Devon granted 89% of the 1,323 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 93%.

Find a Builder in East Devon

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Single-Storey Rear Extension rules in nearby council areas

Other projects in East Devon