Skip to content

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentHart (South East)

Do I Need Planning Permission for a Patio or Paved Area in Hart?

Laying a patio, paved area, or hard surface in your rear garden. Patios are generally permitted as garden improvements with no planning requirements, though front garden paving has specific drainage rules.

Planning in Hart

84%

of planning applications granted

93%

decided within the statutory or agreed time

71%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Hart decided 698 planning applications. 445 of these were householder projects such as extensions, loft conversions and outbuildings, of which 86% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Hart

Hart has 38 conservation areas. These include Basingstoke Canal CA, Bramshill, Cricket Hill, Crondall, Crookham Village, Darby Green Yateley. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Hart has 47 recorded Article 4 directions. These include Bramshill; Broad Oak Odiham Hampshire.; Church Farm (Eversley); Cricket Hill Yateley (Extension). Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Hart planning department to check whether an Article 4 direction applies to your property.

Check with Hart planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Patio or Paved Area

Generally permitted. Laying a patio or hard surface in the rear garden is permitted development as an improvement within the curtilage. Front garden hard surfaces are PD if the surface is permeable or drains to a permeable area within the curtilage.

Conditions

  • 1Rear garden patios are generally PD without specific conditions
  • 2Front garden: must use permeable paving or drain to a permeable area within the garden
  • 3Must not significantly raise the ground level (over 300mm becomes a raised platform)
  • 4Good drainage practice to prevent flooding and waterlogging

Size and Dimension Limits

  • No specific size limit for rear garden patios
  • Front garden: non-permeable surfaces over 5 square metres require PP if not draining to a permeable area

When Permitted Development Does Not Apply

  • Front garden non-permeable paving over 5 square metres requires planning permission (since 2008)
  • Listed buildings may require consent for changes within their curtilage
  • Raised patios over 300mm above ground level may need PP (treated as raised platforms)

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to standard patios. There are no structural, thermal, or fire safety requirements. Drainage should be managed to prevent water pooling against the house (maintaining the damp proof course level).

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Hart building control or use an approved inspector.

How to Apply in Hart

If you need planning permission for your patio or paved area, you can apply through Hart's planning department or via the national Planning Portal.

Timeline:Not applicable for rear garden patios. 8 weeks for front garden applications if PP is needed.
Cost:£258 if planning permission is required.
Visit Hart Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Hart. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk for rear garden patios. Front garden non-permeable paving over 5 square metres without proper drainage is an enforcement risk, though enforcement is relatively uncommon in practice.

Frequently Asked Questions

Do I need planning permission for a patio or paved area in Hart?
Generally permitted. Laying a patio or hard surface in the rear garden is permitted development as an improvement within the curtilage. Front garden hard surfaces are PD if the surface is permeable or drains to a permeable area within the curtilage. Note: Hart has 38 conservation areas (including Basingstoke Canal CA, Bramshill, Cricket Hill) and 47 recorded Article 4 directions where permitted development rights may be restricted. Check with Hart planning department.
Does a patio or paved area in Hart need building regulations?
Building regulations approval is not usually required for a patio or paved area. Building Regulations do not apply to standard patios. There are no structural, thermal, or fire safety requirements. Drainage should be managed to prevent water pooling against the house (maintaining the damp proof course level).
How do I apply for planning permission in Hart?
You can apply for planning permission through Hart's planning department or via the national Planning Portal. £258 if planning permission is required.. Not applicable for rear garden patios. 8 weeks for front garden applications if PP is needed..
How long does planning permission take in Hart?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Hart decided 93% of applications within the statutory or agreed time, and 71% of householder applications within 8 weeks.
What percentage of planning applications does Hart approve?
Hart granted 84% of the 698 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 86%.

Find a Paving Specialist in Hart

Browse local paving specialists on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Patio or Paved Area rules in nearby council areas

Other projects in Hart

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co