Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationHart (South East)

Do I Need Planning Permission for a Driveway Paving in Hart?

Paving or resurfacing a front driveway. Since 2008, non-permeable driveway surfaces over 5 square metres require planning permission unless they drain to a permeable area within the curtilage.

Planning in Hart

81%

of planning applications granted

94%

decided within the statutory or agreed time

73%

of householder applications decided within 8 weeks

In the year to December 2025, Hart decided 734 planning applications. 475 of these were householder projects such as extensions, loft conversions and outbuildings, of which 84% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Hart

Hart has 38 conservation areas. These include Basingstoke Canal CA, Bramshill, Cricket Hill, Crondall, Crookham Village, Darby Green Yateley. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Hart has 47 recorded Article 4 directions. These include Bramshill; Broad Oak Odiham Hampshire.; Church Farm (Eversley); Cricket Hill Yateley (Extension). Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Hart planning department to check whether an Article 4 direction applies to your property.

Check with Hart planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Driveway Paving

Permitted development under Part 1, Class F if the surface is permeable (allows water to soak through) or the surface drains to a permeable area within the curtilage of the dwelling. Non-permeable surfaces over 5 square metres that do not drain to a permeable area require planning permission.

Conditions

  • 1Permeable surfaces (porous paving, gravel, permeable block paving) are PD
  • 2Non-permeable surfaces are PD only if the area is under 5 square metres
  • 3Non-permeable surfaces over 5 square metres are PD if rainwater drains to a permeable area within the property boundary
  • 4A dropped kerb may be needed for vehicular access (separate highway application)

Size and Dimension Limits

  • No maximum size for permeable driveways
  • Non-permeable surfaces: 5 square metres maximum without drainage to a permeable area

When Permitted Development Does Not Apply

  • Listed buildings may require consent
  • Conservation areas may have additional requirements
  • Dropped kerb applications are separate from planning and go through the highway authority
  • SUDs (sustainable urban drainage) best practice should be followed

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to driveway paving. The key requirement is adequate drainage to prevent surface water flooding, as enforced through the planning system rather than Building Regulations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Hart building control or use an approved inspector.

How to Apply in Hart

If you need planning permission for your driveway paving, you can apply through Hart's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Hart Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Hart. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Moderate enforcement risk for non-permeable driveways over 5 square metres without proper drainage. This rule was introduced to reduce surface water flooding, and councils do enforce it. However, the most common practical consequence is an issue raised during property sales rather than proactive enforcement.

Frequently Asked Questions

Do I need planning permission for a driveway paving in Hart?
Permitted development under Part 1, Class F if the surface is permeable (allows water to soak through) or the surface drains to a permeable area within the curtilage of the dwelling. Non-permeable surfaces over 5 square metres that do not drain to a permeable area require planning permission. Note: Hart has 38 conservation areas (including Basingstoke Canal CA, Bramshill, Cricket Hill) and 47 recorded Article 4 directions where permitted development rights may be restricted. Check with Hart planning department.
Does a driveway paving in Hart need building regulations?
Building regulations approval is not usually required for a driveway paving. Building Regulations do not apply to driveway paving. The key requirement is adequate drainage to prevent surface water flooding, as enforced through the planning system rather than Building Regulations.
How do I apply for planning permission in Hart?
You can apply for planning permission through Hart's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Hart?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Hart decided 94% of applications within the statutory or agreed time, and 73% of householder applications within 8 weeks.
What percentage of planning applications does Hart approve?
Hart granted 81% of the 734 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 84%.

Find a Driveway Specialist in Hart

Browse local driveway specialists on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Driveway Paving rules in nearby council areas

Other projects in Hart