Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentNew Forest (South East)

Do I Need Planning Permission for an Orangery in New Forest?

An orangery is similar to a conservatory but features more solid walls with a glazed lantern roof. For planning purposes, an orangery is treated as a single-storey extension and follows the same permitted development rules.

Planning in New Forest

91%

of planning applications granted

97%

decided within the statutory or agreed time

80%

of householder applications decided within 8 weeks

In the year to December 2025, New Forest decided 912 planning applications. 549 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in New Forest

New Forest has 23 conservation areas. These include Ashlett Creek, Bickton, Breamore, Damerham, Eling, Fordingbridge. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

New Forest has 10 recorded Article 4 directions. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact New Forest planning department to check whether an Article 4 direction applies to your property.

Check with New Forest planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Orangery

Generally permitted under Part 1, Class A, following the same rules as single-storey extensions. An orangery is treated identically to any other single-storey rear extension for PD purposes.

Conditions

  • 1Same conditions as single-storey rear extensions
  • 2Maximum depth 3m (semi/terraced) or 4m (detached) under standard PD
  • 3Maximum height 4m; eaves 3m if within 2m of boundary
  • 4Materials should be similar in appearance to the existing dwelling
  • 5Must not cover more than half the curtilage

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: 3m if within 2m of a boundary
  • Depth: 3m (semi/terraced) or 4m (detached) under standard PD

When Permitted Development Does Not Apply

  • Same limitations as single-storey extensions
  • Cumulative total of all extensions and outbuildings must not cover more than half the curtilage
  • Unlike conservatories, orangeries are unlikely to qualify for the Building Regulations exemption (due to solid walls)

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is usually required as orangeries have substantial masonry walls and are generally integrated into the house. Covers structural stability, foundations, thermal performance (Part L), ventilation, drainage, and electrical installations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact New Forest building control or use an approved inspector.

How to Apply in New Forest

If you need planning permission for your orangery, you can apply through New Forest's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit New Forest Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from New Forest. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Same enforcement risk as single-storey extensions. Orangeries that exceed PD limits without permission can be subject to enforcement notices requiring alteration or removal.

Frequently Asked Questions

Do I need planning permission for an orangery in New Forest?
Generally permitted under Part 1, Class A, following the same rules as single-storey extensions. An orangery is treated identically to any other single-storey rear extension for PD purposes. Note: New Forest has 23 conservation areas (including Ashlett Creek, Bickton, Breamore) and 10 recorded Article 4 directions where permitted development rights may be restricted. Check with New Forest planning department.
Does an orangery in New Forest need building regulations?
Yes. Building Regulations approval is usually required as orangeries have substantial masonry walls and are generally integrated into the house. Covers structural stability, foundations, thermal performance (Part L), ventilation, drainage, and electrical installations. Contact New Forest building control or an approved inspector for details.
How do I apply for planning permission in New Forest?
You can apply for planning permission through New Forest's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in New Forest?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, New Forest decided 97% of applications within the statutory or agreed time, and 80% of householder applications within 8 weeks.
What percentage of planning applications does New Forest approve?
New Forest granted 91% of the 912 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find a Builder in New Forest

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Orangery rules in nearby council areas

Other projects in New Forest