Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentNew Forest (South East)

Do I Need Planning Permission for a General Outbuilding in New Forest?

Any detached building within the grounds of your home used for purposes incidental to the dwelling, such as storage, a workshop, a gym, or a games room. This covers the general outbuilding rules under the GPDO.

Planning in New Forest

91%

of planning applications granted

97%

decided within the statutory or agreed time

80%

of householder applications decided within 8 weeks

In the year to December 2025, New Forest decided 912 planning applications. 549 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in New Forest

New Forest has 23 conservation areas. These include Ashlett Creek, Bickton, Breamore, Damerham, Eling, Fordingbridge. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

New Forest has 10 recorded Article 4 directions. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact New Forest planning department to check whether an Article 4 direction applies to your property.

Check with New Forest planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a General Outbuilding

Generally permitted under Part 1, Class E of the GPDO. Outbuildings must be for purposes incidental to the enjoyment of the dwelling and must comply with height, position, and area limits.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation fronting a highway
  • 3Maximum height 2.5m if within 2m of a boundary
  • 4Maximum height 4m (dual-pitch roof) or 3m (any other roof) if more than 2m from a boundary
  • 5Must not cover more than half the curtilage (all outbuildings and extensions combined)

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • No single footprint limit, but cumulative total must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • In designated areas, outbuildings to the side of the house are not PD
  • In designated areas, total outbuilding area exceeding 10 square metres requires PP
  • Must not be used as sleeping accommodation or a separate dwelling
  • Total cumulative outbuilding footprint (including sheds, summer houses, etc.) counts towards the 50% limit

What About Building Regulations?

Building regulations approval is not usually required

Under 15 square metres with no sleeping accommodation: normally exempt. Between 15 and 30 square metres: must be at least 1m from any boundary or constructed of substantially non-combustible materials. Over 30 square metres: Building Regulations apply in full.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact New Forest building control or use an approved inspector.

How to Apply in New Forest

If you need planning permission for your general outbuilding, you can apply through New Forest's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit New Forest Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from New Forest. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement risk increases with the size and use of the outbuilding. Large outbuildings that dominate the garden or are used for residential or commercial purposes attract enforcement. Neighbours' complaints are a common trigger for council investigation.

Frequently Asked Questions

Do I need planning permission for a general outbuilding in New Forest?
Generally permitted under Part 1, Class E of the GPDO. Outbuildings must be for purposes incidental to the enjoyment of the dwelling and must comply with height, position, and area limits. Note: New Forest has 23 conservation areas (including Ashlett Creek, Bickton, Breamore) and 10 recorded Article 4 directions where permitted development rights may be restricted. Check with New Forest planning department.
Does a general outbuilding in New Forest need building regulations?
Building regulations approval is not usually required for a general outbuilding. Under 15 square metres with no sleeping accommodation: normally exempt. Between 15 and 30 square metres: must be at least 1m from any boundary or constructed of substantially non-combustible materials. Over 30 square metres: Building Regulations apply in full.
How do I apply for planning permission in New Forest?
You can apply for planning permission through New Forest's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in New Forest?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, New Forest decided 97% of applications within the statutory or agreed time, and 80% of householder applications within 8 weeks.
What percentage of planning applications does New Forest approve?
New Forest granted 91% of the 912 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find a Builder in New Forest

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

General Outbuilding rules in nearby council areas

Other projects in New Forest