Do I Need Planning Permission for an Oil Tank Installation in Southwark?

Installing a domestic oil storage tank for heating oil. Oil tanks are treated as outbuildings under permitted development and have specific conditions regarding capacity and position.

Planning in Southwark

91%

of planning applications granted

96%

decided within the statutory or agreed time

80%

of householder applications decided within 8 weeks

In the year to December 2025, Southwark decided 1,589 planning applications. 591 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Southwark

Southwark has 53 conservation areas. These include Addington Square, Bear Gardens, Bermondsey Street, Borough High Street, Camberwell Green, Camberwell Grove. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Southwark has 480 recorded Article 4 directions. These include Albion Public House; Alleyns Head; Anchor Tap; Ancient Foresters. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Southwark planning department to check whether an Article 4 direction applies to your property.

Check with Southwark planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Oil Tank Installation

Generally permitted under Part 1, Class E of the GPDO (as an outbuilding). Oil tanks up to 3,500 litres are PD provided they are not between the dwelling and a highway, comply with outbuilding height limits, and do not cover more than half the curtilage.

Conditions

  • 1Maximum capacity: 3,500 litres
  • 2Must not be between the dwelling and a highway
  • 3Must comply with outbuilding PD height limits
  • 4Must not cover more than half the curtilage (combined total)
  • 5Must be sited in accordance with OFTEC guidelines for fire safety and environmental protection

Size and Dimension Limits

  • Capacity: 3,500 litres maximum
  • Height: same as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)

When Permitted Development Does Not Apply

  • Tanks over 3,500 litres are not PD
  • Must not be forward of the principal elevation
  • Environmental regulations apply to prevent oil spills (Oil Storage Regulations 2001)
  • Secondary containment (bunding) is required for tanks over 200 litres in certain areas

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply under Part J (combustion appliances and fuel storage). Covers tank construction, bunding and secondary containment, fire separation distances from buildings, ventilation, and oil supply pipework. An OFTEC-registered installer can self-certify the work.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Southwark building control or use an approved inspector.

How to Apply in Southwark

If you need planning permission for your oil tank installation, you can apply through Southwark's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Southwark Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Southwark. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low planning enforcement risk for tanks within PD limits. Environmental enforcement is a greater concern: oil spills from poorly installed or maintained tanks can result in prosecution by the Environment Agency and clean-up costs of tens of thousands of pounds.

Frequently Asked Questions

Do I need planning permission for an oil tank installation in Southwark?
Generally permitted under Part 1, Class E of the GPDO (as an outbuilding). Oil tanks up to 3,500 litres are PD provided they are not between the dwelling and a highway, comply with outbuilding height limits, and do not cover more than half the curtilage. Note: Southwark has 53 conservation areas (including Addington Square, Bear Gardens, Bermondsey Street) and 480 recorded Article 4 directions where permitted development rights may be restricted. Check with Southwark planning department.
Does an oil tank installation in Southwark need building regulations?
Yes. Building Regulations apply under Part J (combustion appliances and fuel storage). Covers tank construction, bunding and secondary containment, fire separation distances from buildings, ventilation, and oil supply pipework. An OFTEC-registered installer can self-certify the work. Contact Southwark building control or an approved inspector for details.
How do I apply for planning permission in Southwark?
You can apply for planning permission through Southwark's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Southwark?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Southwark decided 96% of applications within the statutory or agreed time, and 80% of householder applications within 8 weeks.
What percentage of planning applications does Southwark approve?
Southwark granted 91% of the 1,589 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Heating Engineer in Southwark

Browse local heating engineers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Oil Tank Installation rules in nearby council areas

Other projects in Southwark