Do I Need Planning Permission for a Demolition in Southwark?

Demolishing a building or structure. The rules vary significantly depending on what is being demolished: a dwelling, an outbuilding, a wall, or part of a larger building.

Planning in Southwark

91%

of planning applications granted

96%

decided within the statutory or agreed time

80%

of householder applications decided within 8 weeks

In the year to December 2025, Southwark decided 1,589 planning applications. 591 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Southwark

Southwark has 53 conservation areas. These include Addington Square, Bear Gardens, Bermondsey Street, Borough High Street, Camberwell Green, Camberwell Grove. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Southwark has 480 recorded Article 4 directions. These include Albion Public House; Alleyns Head; Anchor Tap; Ancient Foresters. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Southwark planning department to check whether an Article 4 direction applies to your property.

Check with Southwark planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Demolition

Whether demolition needs planning permission depends on what is being demolished. Demolition of a dwelling requires planning permission and prior approval under Part 11. Demolition of small outbuildings (under 50 cubic metres) generally does not need permission. Demolition within a conservation area has stricter rules. Internal demolition (removing internal walls) is generally PD.

Conditions

  • 1Demolition of a dwelling: requires planning permission and prior approval (Part 11)
  • 2Small outbuildings and structures under 50 cubic metres: generally do not need PP
  • 3In conservation areas: demolition of any building over 115 cubic metres requires PP
  • 4Internal demolition (non-structural walls): PD as internal alteration
  • 5Demolition of a listed building or a building within its curtilage: requires listed building consent

Size and Dimension Limits

  • Structures under 50 cubic metres: generally no PP needed for demolition
  • In conservation areas: structures over 115 cubic metres require PP for demolition

When Permitted Development Does Not Apply

  • Asbestos survey required before any demolition work
  • Health and safety legislation applies (CDM Regulations for larger projects)
  • Demolition notices may be required under Section 80 of the Building Act 1984
  • Party wall considerations if the structure shares a wall with a neighbour
  • Waste disposal must comply with environmental regulations

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to demolition through the requirement to submit a demolition notice under Section 80 of the Building Act 1984. This must be submitted to the local authority at least 6 weeks before work begins. Covers structural safety during and after demolition, asbestos handling (CAR 2012), dust and noise control, and site safety.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Southwark building control or use an approved inspector.

How to Apply in Southwark

If you need planning permission for your demolition, you can apply through Southwark's planning department or via the national Planning Portal.

Timeline:8 weeks for planning applications. Section 80 demolition notice: at least 6 weeks before work begins.
Cost:£258 for householder planning applications. Prior approval for dwelling demolition: £120.
Visit Southwark Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Southwark. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

High risk for unauthorised demolition. Demolishing a dwelling without permission and prior approval is a serious breach. In conservation areas, unauthorised demolition of a building is a criminal offence. Demolishing a listed building without consent is also a criminal offence with unlimited fines and potential imprisonment.

Frequently Asked Questions

Do I need planning permission for a demolition in Southwark?
Whether demolition needs planning permission depends on what is being demolished. Demolition of a dwelling requires planning permission and prior approval under Part 11. Demolition of small outbuildings (under 50 cubic metres) generally does not need permission. Demolition within a conservation area has stricter rules. Internal demolition (removing internal walls) is generally PD. Note: Southwark has 53 conservation areas (including Addington Square, Bear Gardens, Bermondsey Street) and 480 recorded Article 4 directions where permitted development rights may be restricted. Check with Southwark planning department.
Does a demolition in Southwark need building regulations?
Yes. Building Regulations apply to demolition through the requirement to submit a demolition notice under Section 80 of the Building Act 1984. This must be submitted to the local authority at least 6 weeks before work begins. Covers structural safety during and after demolition, asbestos handling (CAR 2012), dust and noise control, and site safety. Contact Southwark building control or an approved inspector for details.
How do I apply for planning permission in Southwark?
You can apply for planning permission through Southwark's planning department or via the national Planning Portal. £258 for householder planning applications. Prior approval for dwelling demolition: £120.. 8 weeks for planning applications. Section 80 demolition notice: at least 6 weeks before work begins..
How long does planning permission take in Southwark?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Southwark decided 96% of applications within the statutory or agreed time, and 80% of householder applications within 8 weeks.
What percentage of planning applications does Southwark approve?
Southwark granted 91% of the 1,589 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.