Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationAshfield (East Midlands)

Do I Need Planning Permission for a Hard Standing in Ashfield?

Creating a hard surface area on your property for parking, storage, or general use. The rules are the same as for driveway paving: permeable surfaces are PD, while non-permeable surfaces over 5 square metres need careful consideration.

Planning in Ashfield

86%

of planning applications granted

83%

decided within the statutory or agreed time

72%

of householder applications decided within 8 weeks

In the year to December 2025, Ashfield decided 414 planning applications. 183 of these were householder projects such as extensions, loft conversions and outbuildings, of which 88% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Ashfield

Ashfield has 5 conservation areas. These include Annesley, Kirkby Cross, Lower Bagthorpe, Sutton in Ashfield Church and Market Place, Teversal. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Ashfield planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Hard Standing

Whether hard standing is PD depends on the surface type and location. Permeable surfaces (gravel, porous paving, permeable block paving) are PD under Part 1, Class F. Non-permeable surfaces over 5 square metres require planning permission unless they drain to a permeable area within the property boundary. Rear garden hard standing is generally PD.

Conditions

  • 1Permeable surfaces are PD regardless of size
  • 2Rear garden hard standing is generally PD
  • 3Front garden: non-permeable surfaces over 5 square metres require PP unless draining to a permeable area
  • 4Must not significantly raise the ground level (over 300mm becomes a raised platform)

Size and Dimension Limits

  • No size limit for permeable surfaces
  • Non-permeable front surfaces: 5 square metres maximum without drainage provision

When Permitted Development Does Not Apply

  • Front garden non-permeable surfaces over 5 square metres without proper drainage need PP
  • In designated areas, additional restrictions may apply
  • Consider the impact on drainage and flooding for neighbouring properties
  • A dropped kerb is a separate application if vehicular access is needed

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to hard standing. Adequate drainage should be provided to prevent surface water flooding. This is enforced through the planning system and environmental regulations rather than Building Regulations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Ashfield building control or use an approved inspector.

How to Apply in Ashfield

If you need planning permission for your hard standing, you can apply through Ashfield's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Ashfield Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Ashfield. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low to moderate risk depending on the surface type, size, and location. Non-permeable front garden surfaces are the main enforcement concern. The most common practical consequence is an issue raised during property sales rather than proactive council enforcement.

Frequently Asked Questions

Do I need planning permission for a hard standing in Ashfield?
Whether hard standing is PD depends on the surface type and location. Permeable surfaces (gravel, porous paving, permeable block paving) are PD under Part 1, Class F. Non-permeable surfaces over 5 square metres require planning permission unless they drain to a permeable area within the property boundary. Rear garden hard standing is generally PD. Note: Ashfield has 5 conservation areas (including Annesley, Kirkby Cross, Lower Bagthorpe) where permitted development rights may be restricted. Check with Ashfield planning department.
Does a hard standing in Ashfield need building regulations?
Building regulations approval is not usually required for a hard standing. Building Regulations do not apply to hard standing. Adequate drainage should be provided to prevent surface water flooding. This is enforced through the planning system and environmental regulations rather than Building Regulations.
How do I apply for planning permission in Ashfield?
You can apply for planning permission through Ashfield's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Ashfield?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Ashfield decided 83% of applications within the statutory or agreed time, and 72% of householder applications within 8 weeks.
What percentage of planning applications does Ashfield approve?
Ashfield granted 86% of the 414 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 88%.

Find a Builder in Ashfield

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Hard Standing rules in nearby council areas

Other projects in Ashfield