Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentNorth Devon (South West)

Do I Need Planning Permission for a Greenhouse in North Devon?

A glazed garden structure for growing plants. Greenhouses follow the same permitted development rules as other garden outbuildings.

Planning in North Devon

94%

of planning applications granted

98%

decided within the statutory or agreed time

60%

of householder applications decided within 8 weeks

In the year to December 2025, North Devon decided 963 planning applications. 309 of these were householder projects such as extensions, loft conversions and outbuildings, of which 98% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in North Devon

North Devon has 41 conservation areas. These include Ashford, Barnstaple - Ebberly Lawn, Barnstaple - Newport, Barnstaple - Pilton, Barnstaple - Rumsam, Barnstaple - Town Centre. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with North Devon planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Greenhouse

Generally permitted under Part 1, Class E as an outbuilding for purposes incidental to the enjoyment of the dwelling. The same height and area rules apply as for sheds and other outbuildings.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation
  • 3Same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)
  • 4Must not cover more than half the curtilage

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • Total outbuilding area must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • Designated area restrictions apply
  • Must not be used for commercial growing or retail
  • Large greenhouses may attract neighbour complaints about overshadowing or visual impact

What About Building Regulations?

Building regulations approval is not usually required

Greenhouses are normally exempt from Building Regulations as single-storey outbuildings under 30 square metres with no sleeping accommodation. Any electrical installation must comply with Part P.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact North Devon building control or use an approved inspector.

How to Apply in North Devon

If you need planning permission for your greenhouse, you can apply through North Devon's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit North Devon Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from North Devon. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk for domestic greenhouses within PD limits. Enforcement is rare unless the greenhouse is unusually large or used for commercial purposes.

Frequently Asked Questions

Do I need planning permission for a greenhouse in North Devon?
Generally permitted under Part 1, Class E as an outbuilding for purposes incidental to the enjoyment of the dwelling. The same height and area rules apply as for sheds and other outbuildings. Note: North Devon has 41 conservation areas (including Ashford, Barnstaple - Ebberly Lawn, Barnstaple - Newport) where permitted development rights may be restricted. Check with North Devon planning department.
Does a greenhouse in North Devon need building regulations?
Building regulations approval is not usually required for a greenhouse. Greenhouses are normally exempt from Building Regulations as single-storey outbuildings under 30 square metres with no sleeping accommodation. Any electrical installation must comply with Part P.
How do I apply for planning permission in North Devon?
You can apply for planning permission through North Devon's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in North Devon?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, North Devon decided 98% of applications within the statutory or agreed time, and 60% of householder applications within 8 weeks.
What percentage of planning applications does North Devon approve?
North Devon granted 94% of the 963 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 98%.

Find a Builder in North Devon

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Greenhouse rules in nearby council areas

Other projects in North Devon