Skip to content

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentSouth Hams (South West)

Do I Need Planning Permission for a Greenhouse in South Hams?

A glazed garden structure for growing plants. Greenhouses follow the same permitted development rules as other garden outbuildings.

Planning in South Hams

90%

of planning applications granted

95%

decided within the statutory or agreed time

73%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, South Hams decided 1,018 planning applications. 479 of these were householder projects such as extensions, loft conversions and outbuildings, of which 92% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in South Hams

South Hams has 47 conservation areas. These include Ashprington, Aveton Gifford, Baston, Berry Pomeroy, Bigbury, Blackawton. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with South Hams planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Greenhouse

Generally permitted under Part 1, Class E as an outbuilding for purposes incidental to the enjoyment of the dwelling. The same height and area rules apply as for sheds and other outbuildings.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation
  • 3Same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)
  • 4Must not cover more than half the curtilage

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • Total outbuilding area must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • Designated area restrictions apply
  • Must not be used for commercial growing or retail
  • Large greenhouses may attract neighbour complaints about overshadowing or visual impact

What About Building Regulations?

Building regulations approval is not usually required

Greenhouses are normally exempt from Building Regulations as single-storey outbuildings under 30 square metres with no sleeping accommodation. Any electrical installation must comply with Part P.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact South Hams building control or use an approved inspector.

How to Apply in South Hams

If you need planning permission for your greenhouse, you can apply through South Hams's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit South Hams Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from South Hams. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk for domestic greenhouses within PD limits. Enforcement is rare unless the greenhouse is unusually large or used for commercial purposes.

Frequently Asked Questions

Do I need planning permission for a greenhouse in South Hams?
Generally permitted under Part 1, Class E as an outbuilding for purposes incidental to the enjoyment of the dwelling. The same height and area rules apply as for sheds and other outbuildings. Note: South Hams has 47 conservation areas (including Ashprington, Aveton Gifford, Baston) where permitted development rights may be restricted. Check with South Hams planning department.
Does a greenhouse in South Hams need building regulations?
Building regulations approval is not usually required for a greenhouse. Greenhouses are normally exempt from Building Regulations as single-storey outbuildings under 30 square metres with no sleeping accommodation. Any electrical installation must comply with Part P.
How do I apply for planning permission in South Hams?
You can apply for planning permission through South Hams's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in South Hams?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, South Hams decided 95% of applications within the statutory or agreed time, and 73% of householder applications within 8 weeks.
What percentage of planning applications does South Hams approve?
South Hams granted 90% of the 1,018 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 92%.

Find a Builder in South Hams

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Greenhouse rules in nearby council areas

Other projects in South Hams

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co