Do I Need Planning Permission for a Flue or Extraction System in Maidstone?

Installing a flue, chimney, or extraction system on your property (for example, for a kitchen extractor, boiler, or stove). The permitted development rules are the same as for new chimney/flue installation.

Planning in Maidstone

82%

of planning applications granted

97%

decided within the statutory or agreed time

84%

of householder applications decided within 8 weeks

In the year to December 2025, Maidstone decided 1,125 planning applications. 552 of these were householder projects such as extensions, loft conversions and outbuildings, of which 89% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Maidstone

Maidstone has 49 conservation areas. These include Bearsted Extension, Bearsted, Holy Cross Church, Bearsted, Village Green, Boughton Malherbe, Boughton Monchelsea, Cock Street, Boughton Monchelsea, The Green. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Maidstone has 84 recorded Article 4 directions. These include Beaux Aires Farm,; Bow Bridge and Teston Bridge; Butlers Farm Loose; Clarendon Place. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Maidstone planning department to check whether an Article 4 direction applies to your property.

Check with Maidstone planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Flue or Extraction System

Generally permitted under Part 1, Class G of the GPDO. One flue, chimney, or soil and vent pipe is permitted on a dwelling provided it does not exceed the highest part of the roof by more than 1 metre. The flue must not be on the principal elevation in designated areas.

Conditions

  • 1Must not exceed the highest part of the roof by more than 1m
  • 2Only one flue per dwelling under PD
  • 3Must not be on the principal elevation or side elevation fronting a highway in designated areas
  • 4Kitchen extraction: external vent or ducting follows the same rules
  • 5Must comply with clean air legislation if for a combustion appliance

Size and Dimension Limits

  • Must not exceed the highest part of the roof by more than 1m
  • One flue only under PD

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • In conservation areas, position and appearance restrictions apply
  • Odour and noise from extraction systems can be a statutory nuisance
  • Additional flues beyond the first require planning permission

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply if the flue or extraction system serves a combustion appliance (Part J). Kitchen and bathroom extraction must comply with Part F (ventilation). Gas flues must be installed by a Gas Safe registered engineer. A HETAS-registered installer can self-certify solid fuel installations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Maidstone building control or use an approved inspector.

How to Apply in Maidstone

If you need planning permission for your flue or extraction system, you can apply through Maidstone's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Maidstone Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Maidstone. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for standard domestic flues within PD limits. Extraction systems that cause odour or noise nuisance to neighbours are more likely to be addressed under environmental health legislation than planning enforcement.

Frequently Asked Questions

Do I need planning permission for a flue or extraction system in Maidstone?
Generally permitted under Part 1, Class G of the GPDO. One flue, chimney, or soil and vent pipe is permitted on a dwelling provided it does not exceed the highest part of the roof by more than 1 metre. The flue must not be on the principal elevation in designated areas. Note: Maidstone has 49 conservation areas (including Bearsted Extension, Bearsted, Holy Cross Church, Bearsted, Village Green) and 84 recorded Article 4 directions where permitted development rights may be restricted. Check with Maidstone planning department.
Does a flue or extraction system in Maidstone need building regulations?
Yes. Building Regulations apply if the flue or extraction system serves a combustion appliance (Part J). Kitchen and bathroom extraction must comply with Part F (ventilation). Gas flues must be installed by a Gas Safe registered engineer. A HETAS-registered installer can self-certify solid fuel installations. Contact Maidstone building control or an approved inspector for details.
How do I apply for planning permission in Maidstone?
You can apply for planning permission through Maidstone's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Maidstone?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Maidstone decided 97% of applications within the statutory or agreed time, and 84% of householder applications within 8 weeks.
What percentage of planning applications does Maidstone approve?
Maidstone granted 82% of the 1,125 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 89%.