This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentExmoor National Park (South West)

Do I Need Planning Permission for a Flue or Extraction System in Exmoor National Park?

Installing a flue, chimney, or extraction system on your property (for example, for a kitchen extractor, boiler, or stove). The permitted development rules are the same as for new chimney/flue installation.

Planning in Exmoor National Park

93%

of planning applications granted

99%

decided within the statutory or agreed time

43%

of householder applications decided within 8 weeks

In the year to December 2025, Exmoor National Park decided 161 planning applications. 51 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Exmoor National Park

Exmoor National Park has 17 conservation areas. These include Allerford, Bossington and West Lynch, Colton Farm, Dulverton, Dunster, Leigh Barton. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Exmoor National Park planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Flue or Extraction System

Generally permitted under Part 1, Class G of the GPDO. One flue, chimney, or soil and vent pipe is permitted on a dwelling provided it does not exceed the highest part of the roof by more than 1 metre. The flue must not be on the principal elevation in designated areas.

Conditions

  • 1Must not exceed the highest part of the roof by more than 1m
  • 2Only one flue per dwelling under PD
  • 3Must not be on the principal elevation or side elevation fronting a highway in designated areas
  • 4Kitchen extraction: external vent or ducting follows the same rules
  • 5Must comply with clean air legislation if for a combustion appliance

Size and Dimension Limits

  • Must not exceed the highest part of the roof by more than 1m
  • One flue only under PD

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • In conservation areas, position and appearance restrictions apply
  • Odour and noise from extraction systems can be a statutory nuisance
  • Additional flues beyond the first require planning permission

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply if the flue or extraction system serves a combustion appliance (Part J). Kitchen and bathroom extraction must comply with Part F (ventilation). Gas flues must be installed by a Gas Safe registered engineer. A HETAS-registered installer can self-certify solid fuel installations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Exmoor National Park building control or use an approved inspector.

How to Apply in Exmoor National Park

If you need planning permission for your flue or extraction system, you can apply through Exmoor National Park's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Exmoor National Park Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Exmoor National Park. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for standard domestic flues within PD limits. Extraction systems that cause odour or noise nuisance to neighbours are more likely to be addressed under environmental health legislation than planning enforcement.

Frequently Asked Questions

Do I need planning permission for a flue or extraction system in Exmoor National Park?
Generally permitted under Part 1, Class G of the GPDO. One flue, chimney, or soil and vent pipe is permitted on a dwelling provided it does not exceed the highest part of the roof by more than 1 metre. The flue must not be on the principal elevation in designated areas. Note: Exmoor National Park has 17 conservation areas (including Allerford, Bossington and West Lynch, Colton Farm) where permitted development rights may be restricted. Check with Exmoor National Park planning department.
Does a flue or extraction system in Exmoor National Park need building regulations?
Yes. Building Regulations apply if the flue or extraction system serves a combustion appliance (Part J). Kitchen and bathroom extraction must comply with Part F (ventilation). Gas flues must be installed by a Gas Safe registered engineer. A HETAS-registered installer can self-certify solid fuel installations. Contact Exmoor National Park building control or an approved inspector for details.
How do I apply for planning permission in Exmoor National Park?
You can apply for planning permission through Exmoor National Park's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Exmoor National Park?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Exmoor National Park decided 99% of applications within the statutory or agreed time, and 43% of householder applications within 8 weeks.
What percentage of planning applications does Exmoor National Park approve?
Exmoor National Park granted 93% of the 161 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find a Builder in Exmoor National Park

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Flue or Extraction System rules in nearby council areas

Other projects in Exmoor National Park