This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentNorth Warwickshire (West Midlands)

Do I Need Planning Permission for a Fencing (Under 2 Metres) in North Warwickshire?

Installing, replacing, or maintaining a fence up to 2 metres in height. Fencing under 2m is one of the most straightforward permitted development rights, with few restrictions.

Planning in North Warwickshire

93%

of planning applications granted

86%

decided within the statutory or agreed time

60%

of householder applications decided within 8 weeks

In the year to December 2025, North Warwickshire decided 375 planning applications. 175 of these were householder projects such as extensions, loft conversions and outbuildings, of which 97% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in North Warwickshire

North Warwickshire has 11 conservation areas. These include Atherstone, Caldecote, Coleshill, Coleshill (Coventry Road), Fillongley, Kingsbury. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

North Warwickshire has 10 recorded Article 4 directions. These include Appleby Hill, Austrey; Borough wide; Land at Mancetter; The Bungalow, Parsonage Farm, Great Packington. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact North Warwickshire planning department to check whether an Article 4 direction applies to your property.

Check with North Warwickshire planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Fencing (Under 2 Metres)

Generally permitted under Part 2, Class A of the GPDO. Fences, walls, and gates up to 2m in height do not require planning permission, provided they are not adjacent to a highway used by vehicular traffic (where the limit is 1m).

Conditions

  • 1Maximum height of 2m
  • 2If adjacent to a highway used by vehicular traffic, maximum height is 1m
  • 3Must not be erected in front of the principal elevation if it would exceed 1m (highway boundary)
  • 4Replacement fencing to the same height is also PD

Size and Dimension Limits

  • Height: 2m maximum (1m if adjacent to a highway used by vehicles)

When Permitted Development Does Not Apply

  • Listed building consent may be needed if the fence affects the setting of a listed building
  • In conservation areas, fencing is generally still PD but check for Article 4 directions
  • High hedges are covered by separate legislation (Anti-social Behaviour Act 2003, Part 8)
  • Boundary disputes are a civil matter, not a planning issue

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to garden fencing. There are no structural, thermal, or fire safety requirements for domestic fences under 2m.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact North Warwickshire building control or use an approved inspector.

How to Apply in North Warwickshire

If you need planning permission for your fencing (under 2 metres), you can apply through North Warwickshire's planning department or via the national Planning Portal.

Timeline:Not applicable for fencing under 2m.
Cost:£258 if planning permission is required.
Visit North Warwickshire Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from North Warwickshire. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk for fencing under 2m. Enforcement is only likely if the fence is on a highway boundary and exceeds 1m, or if there is an Article 4 direction. Boundary ownership disputes are a civil matter between neighbours.

Frequently Asked Questions

Do I need planning permission for a fencing (under 2 metres) in North Warwickshire?
Generally permitted under Part 2, Class A of the GPDO. Fences, walls, and gates up to 2m in height do not require planning permission, provided they are not adjacent to a highway used by vehicular traffic (where the limit is 1m). Note: North Warwickshire has 11 conservation areas (including Atherstone, Caldecote, Coleshill) and 10 recorded Article 4 directions where permitted development rights may be restricted. Check with North Warwickshire planning department.
Does a fencing (under 2 metres) in North Warwickshire need building regulations?
Building regulations approval is not usually required for a fencing (under 2 metres). Building Regulations do not apply to garden fencing. There are no structural, thermal, or fire safety requirements for domestic fences under 2m.
How do I apply for planning permission in North Warwickshire?
You can apply for planning permission through North Warwickshire's planning department or via the national Planning Portal. £258 if planning permission is required.. Not applicable for fencing under 2m..
How long does planning permission take in North Warwickshire?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, North Warwickshire decided 86% of applications within the statutory or agreed time, and 60% of householder applications within 8 weeks.
What percentage of planning applications does North Warwickshire approve?
North Warwickshire granted 93% of the 375 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 97%.

Find a Fencing Specialist in North Warwickshire

Browse local fencing specialists on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Fencing (Under 2 Metres) rules in nearby council areas

Other projects in North Warwickshire