Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentStockport (North West)

Do I Need Planning Permission for an EV Charging Point in Stockport?

Installing an electric vehicle charging point on your property. Wall-mounted and post-mounted chargers have specific permitted development rights under Part 2 of the GPDO.

Planning in Stockport

95%

of planning applications granted

98%

decided within the statutory or agreed time

81%

of householder applications decided within 8 weeks

In the year to December 2025, Stockport decided 1,293 planning applications. 953 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Stockport

Stockport has 37 conservation areas. These include Alexandra Park Edgeley Conservation Area, All Saints, Barlow Fold, Romiley, Bramall Park, Bramhall Lane South, Brook Bottom - Joint designation with High Peak Bo. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Stockport has 60 recorded Article 4 directions. These include Alexandra Park; All Saints; Barlow Fold; Bramall Park. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Stockport planning department to check whether an Article 4 direction applies to your property.

Check with Stockport planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an EV Charging Point

Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume.

Conditions

  • 1One charging point per property under PD
  • 2Wall-mounted units must not be on a wall facing a highway
  • 3Must not exceed 0.2 cubic metres in volume
  • 4Must not be within 2m of a highway (for post-mounted units in designated areas)
  • 5Must not be on a listed building or within the curtilage of a listed building (in designated areas)

Size and Dimension Limits

  • Maximum volume: 0.2 cubic metres
  • One unit per property under PD

When Permitted Development Does Not Apply

  • Not PD on listed buildings or within the curtilage of a listed building in designated areas
  • Post-mounted units in designated areas must not be within 2m of a highway
  • A second charger requires planning permission
  • Electrical installation must be carried out by a qualified electrician

What About Building Regulations?

Building regulations approval is likely required

The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Stockport building control or use an approved inspector.

How to Apply in Stockport

If you need planning permission for your ev charging point, you can apply through Stockport's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Stockport Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Stockport. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk. EV chargers are small and unobtrusive. Enforcement is only likely if the unit is on a listed building without consent or is a second unit installed without permission.

Frequently Asked Questions

Do I need planning permission for an ev charging point in Stockport?
Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume. Note: Stockport has 37 conservation areas (including Alexandra Park Edgeley Conservation Area, All Saints, Barlow Fold, Romiley) and 60 recorded Article 4 directions where permitted development rights may be restricted. Check with Stockport planning department.
Does an ev charging point in Stockport need building regulations?
Yes. The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection. Contact Stockport building control or an approved inspector for details.
How do I apply for planning permission in Stockport?
You can apply for planning permission through Stockport's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Stockport?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Stockport decided 98% of applications within the statutory or agreed time, and 81% of householder applications within 8 weeks.
What percentage of planning applications does Stockport approve?
Stockport granted 95% of the 1,293 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find an EV Charger Installer in Stockport

Browse local ev charger installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

EV Charging Point rules in nearby council areas

Other projects in Stockport