This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentPeterborough (East of England)

Do I Need Planning Permission for an EV Charging Point in Peterborough?

Installing an electric vehicle charging point on your property. Wall-mounted and post-mounted chargers have specific permitted development rights under Part 2 of the GPDO.

Planning in Peterborough

84%

of planning applications granted

78%

decided within the statutory or agreed time

64%

of householder applications decided within 8 weeks

In the year to December 2025, Peterborough decided 706 planning applications. 352 of these were householder projects such as extensions, loft conversions and outbuildings, of which 89% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Peterborough

Peterborough has 30 conservation areas. These include Ailsworth Conservation Area, Alwalton Conservation Area, Bainton Conservation Area, Barnack Conservation Area, Castor Conservation Area, City Centre Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Peterborough has 108 recorded Article 4 directions. These include Aberfeldy Main Street, Barnack; Aberfoyle Main Street, Barnack; Baptist Church, Church Street, Stanground; Bay Tree Cottage Stamford Road, Barnack. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Peterborough planning department to check whether an Article 4 direction applies to your property.

Check with Peterborough planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an EV Charging Point

Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume.

Conditions

  • 1One charging point per property under PD
  • 2Wall-mounted units must not be on a wall facing a highway
  • 3Must not exceed 0.2 cubic metres in volume
  • 4Must not be within 2m of a highway (for post-mounted units in designated areas)
  • 5Must not be on a listed building or within the curtilage of a listed building (in designated areas)

Size and Dimension Limits

  • Maximum volume: 0.2 cubic metres
  • One unit per property under PD

When Permitted Development Does Not Apply

  • Not PD on listed buildings or within the curtilage of a listed building in designated areas
  • Post-mounted units in designated areas must not be within 2m of a highway
  • A second charger requires planning permission
  • Electrical installation must be carried out by a qualified electrician

What About Building Regulations?

Building regulations approval is likely required

The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Peterborough building control or use an approved inspector.

How to Apply in Peterborough

If you need planning permission for your ev charging point, you can apply through Peterborough's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Peterborough Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Peterborough. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk. EV chargers are small and unobtrusive. Enforcement is only likely if the unit is on a listed building without consent or is a second unit installed without permission.

Frequently Asked Questions

Do I need planning permission for an ev charging point in Peterborough?
Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume. Note: Peterborough has 30 conservation areas (including Ailsworth Conservation Area, Alwalton Conservation Area, Bainton Conservation Area) and 108 recorded Article 4 directions where permitted development rights may be restricted. Check with Peterborough planning department.
Does an ev charging point in Peterborough need building regulations?
Yes. The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection. Contact Peterborough building control or an approved inspector for details.
How do I apply for planning permission in Peterborough?
You can apply for planning permission through Peterborough's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Peterborough?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Peterborough decided 78% of applications within the statutory or agreed time, and 64% of householder applications within 8 weeks.
What percentage of planning applications does Peterborough approve?
Peterborough granted 84% of the 706 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 89%.

Find an EV Charger Installer in Peterborough

Browse local ev charger installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.