Usually Permitted DevelopmentBromsgrove (West Midlands)

Do I Need Planning Permission for an EV Charging Point in Bromsgrove?

Installing an electric vehicle charging point on your property. Wall-mounted and post-mounted chargers have specific permitted development rights under Part 2 of the GPDO.

Planning in Bromsgrove

94%

of planning applications granted

85%

decided within the statutory or agreed time

63%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Bromsgrove decided 476 planning applications. 288 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Bromsgrove

Bromsgrove has 12 conservation areas. These include Alvechurch, Barnt Green, Belbroughton, Beoley, Bromsgrove Town Centre, Clent. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Bromsgrove planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an EV Charging Point

Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume.

Conditions

  • 1One charging point per property under PD
  • 2Wall-mounted units must not be on a wall facing a highway
  • 3Must not exceed 0.2 cubic metres in volume
  • 4Must not be within 2m of a highway (for post-mounted units in designated areas)
  • 5Must not be on a listed building or within the curtilage of a listed building (in designated areas)

Size and Dimension Limits

  • Maximum volume: 0.2 cubic metres
  • One unit per property under PD

When Permitted Development Does Not Apply

  • Not PD on listed buildings or within the curtilage of a listed building in designated areas
  • Post-mounted units in designated areas must not be within 2m of a highway
  • A second charger requires planning permission
  • Electrical installation must be carried out by a qualified electrician

What About Building Regulations?

Building regulations approval is likely required

The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Bromsgrove building control or use an approved inspector.

How to Apply in Bromsgrove

If you need planning permission for your ev charging point, you can apply through Bromsgrove's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Bromsgrove Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Bromsgrove. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk. EV chargers are small and unobtrusive. Enforcement is only likely if the unit is on a listed building without consent or is a second unit installed without permission.

Frequently Asked Questions

Do I need planning permission for an ev charging point in Bromsgrove?
Generally permitted under Part 2, Class D of the GPDO. One charging point is permitted per property. Wall-mounted units must not face a highway. The unit must not exceed 0.2 cubic metres in volume. Note: Bromsgrove has 12 conservation areas (including Alvechurch, Barnt Green, Belbroughton) where permitted development rights may be restricted. Check with Bromsgrove planning department.
Does an ev charging point in Bromsgrove need building regulations?
Yes. The electrical installation must comply with Building Regulations Part P. The work should be carried out by a registered electrician (NICEIC, NAPIT, or equivalent) who can self-certify the installation. The charger must comply with BS 7671 (IET Wiring Regulations) and have appropriate circuit protection. Contact Bromsgrove building control or an approved inspector for details.
How do I apply for planning permission in Bromsgrove?
You can apply for planning permission through Bromsgrove's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Bromsgrove?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Bromsgrove decided 85% of applications within the statutory or agreed time, and 63% of householder applications within 8 weeks.
What percentage of planning applications does Bromsgrove approve?
Bromsgrove granted 94% of the 476 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find an EV Charger Installer in Bromsgrove

Browse local ev charger installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

EV Charging Point rules in nearby council areas

Other projects in Bromsgrove

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co