This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentBlaby (East Midlands)

Do I Need Planning Permission for a Dormer Window in Blaby?

A structural window that projects vertically from a sloping roof, creating additional headroom and usable space in a loft. Dormers follow the same PD rules as loft conversions under Part 1, Class B.

Planning in Blaby

91%

of planning applications granted

89%

decided within the statutory or agreed time

55%

of householder applications decided within 8 weeks

In the year to December 2025, Blaby decided 491 planning applications. 319 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Blaby

Blaby has 11 conservation areas. These include Aston Flamville, Blaby, Cosby, Countesthorpe, Croft, Enderby. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Blaby planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Dormer Window

Generally permitted under Part 1, Class B of the GPDO. The same volume limits and conditions apply as for loft conversions with dormers. The dormer must not face a highway, and materials must match the existing roof.

Conditions

  • 1Must not add more than 40 cubic metres (terraced) or 50 cubic metres (detached/semi-detached) of additional roof space
  • 2Must not extend beyond the plane of the existing roof slope facing a highway
  • 3Must not exceed the highest part of the existing roof
  • 4Materials must be similar in appearance to the existing house
  • 5Set back at least 200mm from the original eaves

Size and Dimension Limits

  • Volume: 40 cubic metres (terraced) or 50 cubic metres (detached/semi-detached)
  • Must not exceed the existing roof ridge height
  • Set back 200mm from eaves

When Permitted Development Does Not Apply

  • Not permitted development on the principal elevation facing a highway
  • Designated area restrictions apply (rear dormers may still be PD; check with LPA)
  • Previous roof extensions reduce the remaining volume allowance
  • Side-facing windows must be obscure glazed and non-opening below 1.7m

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply covering structural integrity of the roof and supporting walls, fire safety, thermal insulation, ventilation, and any associated staircase or access alterations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Blaby building control or use an approved inspector.

How to Apply in Blaby

If you need planning permission for your dormer window, you can apply through Blaby's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Blaby Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Blaby. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Unauthorised dormers are highly visible and almost always attract enforcement. The council can require removal and reinstatement of the original roof, which is extremely expensive.

Frequently Asked Questions

Do I need planning permission for a dormer window in Blaby?
Generally permitted under Part 1, Class B of the GPDO. The same volume limits and conditions apply as for loft conversions with dormers. The dormer must not face a highway, and materials must match the existing roof. Note: Blaby has 11 conservation areas (including Aston Flamville, Blaby, Cosby) where permitted development rights may be restricted. Check with Blaby planning department.
Does a dormer window in Blaby need building regulations?
Yes. Building Regulations apply covering structural integrity of the roof and supporting walls, fire safety, thermal insulation, ventilation, and any associated staircase or access alterations. Contact Blaby building control or an approved inspector for details.
How do I apply for planning permission in Blaby?
You can apply for planning permission through Blaby's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Blaby?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Blaby decided 89% of applications within the statutory or agreed time, and 55% of householder applications within 8 weeks.
What percentage of planning applications does Blaby approve?
Blaby granted 91% of the 491 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.