Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentYork (Yorkshire and the Humber)

Do I Need Planning Permission for a Decking in York?

Installing timber or composite decking in your garden. Decking is generally permitted but must not be raised more than 300mm above ground level, as higher decking is treated as a raised platform with stricter rules.

Planning in York

84%

of planning applications granted

85%

decided within the statutory or agreed time

63%

of householder applications decided within 8 weeks

In the year to December 2025, York decided 1,243 planning applications. 628 of these were householder projects such as extensions, loft conversions and outbuildings, of which 88% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in York

York has 35 conservation areas. These include Acomb Conservation Area, Askham Bryan Conservation Area, Askham Richard Conservation Area, Bishopthorpe Conservation Area, Central Historic Core Conservation Area, Clifton (Malton Way/Shipton Road) Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

York has 3 recorded Article 4 directions. These include East Mount Road; Heslington Conservation Area. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact York planning department to check whether an Article 4 direction applies to your property.

Check with York planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Decking

Generally permitted under Part 1, Class E of the GPDO (treated as an improvement within the curtilage). Decking that does not exceed 300mm above the existing ground level is permitted development. Decking above 300mm is treated as a raised platform and may need planning permission.

Conditions

  • 1Must not exceed 300mm above the existing ground level
  • 2Counts towards the 50% curtilage coverage limit (combined with outbuildings and extensions)
  • 3Must not be forward of the principal elevation fronting a highway
  • 4Balustrades and railings on top of the decking count towards the height measurement

Size and Dimension Limits

  • Height above ground: 300mm maximum (including any framework)
  • No specific area limit, but counts towards 50% curtilage coverage

When Permitted Development Does Not Apply

  • Decking over 300mm above ground is a raised platform and may require planning permission
  • In designated areas, decking to the side of the house may not be PD
  • Overlooking from raised decking is a common neighbour concern
  • Drainage and water runoff should be considered

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not normally apply to standard garden decking. Structural adequacy is the homeowner's responsibility. If the decking is attached to the house and forms part of an extension or raised platform, Building Regulations may apply.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact York building control or use an approved inspector.

How to Apply in York

If you need planning permission for your decking, you can apply through York's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit York Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from York. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for decking at or near ground level. Raised decking over 300mm is a common cause of enforcement action, particularly where it allows overlooking of neighbouring gardens. The council can require removal or reduction of non-compliant decking.

Frequently Asked Questions

Do I need planning permission for a decking in York?
Generally permitted under Part 1, Class E of the GPDO (treated as an improvement within the curtilage). Decking that does not exceed 300mm above the existing ground level is permitted development. Decking above 300mm is treated as a raised platform and may need planning permission. Note: York has 35 conservation areas (including Acomb Conservation Area, Askham Bryan Conservation Area, Askham Richard Conservation Area) and 3 recorded Article 4 directions where permitted development rights may be restricted. Check with York planning department.
Does a decking in York need building regulations?
Building regulations approval is not usually required for a decking. Building Regulations do not normally apply to standard garden decking. Structural adequacy is the homeowner's responsibility. If the decking is attached to the house and forms part of an extension or raised platform, Building Regulations may apply.
How do I apply for planning permission in York?
You can apply for planning permission through York's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in York?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, York decided 85% of applications within the statutory or agreed time, and 63% of householder applications within 8 weeks.
What percentage of planning applications does York approve?
York granted 84% of the 1,243 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 88%.

Find a Carpenter in York

Browse local carpenters on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Decking rules in nearby council areas

Other projects in York