Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentWestminster (London)

Do I Need Planning Permission for a Decking in Westminster?

Installing timber or composite decking in your garden. Decking is generally permitted but must not be raised more than 300mm above ground level, as higher decking is treated as a raised platform with stricter rules.

Planning in Westminster

86%

of planning applications granted

81%

decided within the statutory or agreed time

53%

of householder applications decided within 8 weeks

In the year to December 2025, Westminster decided 4,828 planning applications. 435 of these were householder projects such as extensions, loft conversions and outbuildings, of which 79% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Westminster

Westminster has 56 conservation areas. These include Adelphi, Albert Gate, Aldridge Road Villas And Leamington Road Villas, Bayswater, Belgravia, Birdcage Walk. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Westminster has 10 recorded Article 4 directions. These include Queens Park Estate. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Westminster planning department to check whether an Article 4 direction applies to your property.

Check with Westminster planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Decking

Generally permitted under Part 1, Class E of the GPDO (treated as an improvement within the curtilage). Decking that does not exceed 300mm above the existing ground level is permitted development. Decking above 300mm is treated as a raised platform and may need planning permission.

Conditions

  • 1Must not exceed 300mm above the existing ground level
  • 2Counts towards the 50% curtilage coverage limit (combined with outbuildings and extensions)
  • 3Must not be forward of the principal elevation fronting a highway
  • 4Balustrades and railings on top of the decking count towards the height measurement

Size and Dimension Limits

  • Height above ground: 300mm maximum (including any framework)
  • No specific area limit, but counts towards 50% curtilage coverage

When Permitted Development Does Not Apply

  • Decking over 300mm above ground is a raised platform and may require planning permission
  • In designated areas, decking to the side of the house may not be PD
  • Overlooking from raised decking is a common neighbour concern
  • Drainage and water runoff should be considered

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not normally apply to standard garden decking. Structural adequacy is the homeowner's responsibility. If the decking is attached to the house and forms part of an extension or raised platform, Building Regulations may apply.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Westminster building control or use an approved inspector.

How to Apply in Westminster

If you need planning permission for your decking, you can apply through Westminster's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Westminster Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Westminster. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for decking at or near ground level. Raised decking over 300mm is a common cause of enforcement action, particularly where it allows overlooking of neighbouring gardens. The council can require removal or reduction of non-compliant decking.

Frequently Asked Questions

Do I need planning permission for a decking in Westminster?
Generally permitted under Part 1, Class E of the GPDO (treated as an improvement within the curtilage). Decking that does not exceed 300mm above the existing ground level is permitted development. Decking above 300mm is treated as a raised platform and may need planning permission. Note: Westminster has 56 conservation areas (including Adelphi, Albert Gate, Aldridge Road Villas And Leamington Road Villas) and 10 recorded Article 4 directions where permitted development rights may be restricted. Check with Westminster planning department.
Does a decking in Westminster need building regulations?
Building regulations approval is not usually required for a decking. Building Regulations do not normally apply to standard garden decking. Structural adequacy is the homeowner's responsibility. If the decking is attached to the house and forms part of an extension or raised platform, Building Regulations may apply.
How do I apply for planning permission in Westminster?
You can apply for planning permission through Westminster's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Westminster?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Westminster decided 81% of applications within the statutory or agreed time, and 53% of householder applications within 8 weeks.
What percentage of planning applications does Westminster approve?
Westminster granted 86% of the 4,828 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 79%.

Find a Carpenter in Westminster

Browse local carpenters on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Decking rules in nearby council areas

Other projects in Westminster