Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentDerbyshire Dales (East Midlands)

Do I Need Planning Permission for a Decking in Derbyshire Dales?

Installing timber or composite decking in your garden. Decking is generally permitted but must not be raised more than 300mm above ground level, as higher decking is treated as a raised platform with stricter rules.

Planning in Derbyshire Dales

89%

of planning applications granted

78%

decided within the statutory or agreed time

73%

of householder applications decided within 8 weeks

In the year to December 2025, Derbyshire Dales decided 498 planning applications. 200 of these were householder projects such as extensions, loft conversions and outbuildings, of which 92% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Derbyshire Dales

Derbyshire Dales has 33 conservation areas. These include Ashbourne, Bolehill, Bonsall, Brailsford, Brassington, Callow Hall. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Derbyshire Dales has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Derbyshire Dales planning department to check whether an Article 4 direction applies to your property.

Check with Derbyshire Dales planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Decking

Generally permitted under Part 1, Class E of the GPDO (treated as an improvement within the curtilage). Decking that does not exceed 300mm above the existing ground level is permitted development. Decking above 300mm is treated as a raised platform and may need planning permission.

Conditions

  • 1Must not exceed 300mm above the existing ground level
  • 2Counts towards the 50% curtilage coverage limit (combined with outbuildings and extensions)
  • 3Must not be forward of the principal elevation fronting a highway
  • 4Balustrades and railings on top of the decking count towards the height measurement

Size and Dimension Limits

  • Height above ground: 300mm maximum (including any framework)
  • No specific area limit, but counts towards 50% curtilage coverage

When Permitted Development Does Not Apply

  • Decking over 300mm above ground is a raised platform and may require planning permission
  • In designated areas, decking to the side of the house may not be PD
  • Overlooking from raised decking is a common neighbour concern
  • Drainage and water runoff should be considered

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not normally apply to standard garden decking. Structural adequacy is the homeowner's responsibility. If the decking is attached to the house and forms part of an extension or raised platform, Building Regulations may apply.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Derbyshire Dales building control or use an approved inspector.

How to Apply in Derbyshire Dales

If you need planning permission for your decking, you can apply through Derbyshire Dales's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Derbyshire Dales Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Derbyshire Dales. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for decking at or near ground level. Raised decking over 300mm is a common cause of enforcement action, particularly where it allows overlooking of neighbouring gardens. The council can require removal or reduction of non-compliant decking.

Frequently Asked Questions

Do I need planning permission for a decking in Derbyshire Dales?
Generally permitted under Part 1, Class E of the GPDO (treated as an improvement within the curtilage). Decking that does not exceed 300mm above the existing ground level is permitted development. Decking above 300mm is treated as a raised platform and may need planning permission. Note: Derbyshire Dales has 33 conservation areas (including Ashbourne, Bolehill, Bonsall) where permitted development rights may be restricted. Check with Derbyshire Dales planning department.
Does a decking in Derbyshire Dales need building regulations?
Building regulations approval is not usually required for a decking. Building Regulations do not normally apply to standard garden decking. Structural adequacy is the homeowner's responsibility. If the decking is attached to the house and forms part of an extension or raised platform, Building Regulations may apply.
How do I apply for planning permission in Derbyshire Dales?
You can apply for planning permission through Derbyshire Dales's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Derbyshire Dales?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Derbyshire Dales decided 78% of applications within the statutory or agreed time, and 73% of householder applications within 8 weeks.
What percentage of planning applications does Derbyshire Dales approve?
Derbyshire Dales granted 89% of the 498 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 92%.

Find a Carpenter in Derbyshire Dales

Browse local carpenters on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Decking rules in nearby council areas

Other projects in Derbyshire Dales