Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentNorth Somerset (South West)

Do I Need Planning Permission for a Battery Storage System in North Somerset?

Installing a home battery storage system (such as Tesla Powerwall) to store electricity from solar panels or the grid. Internal installations are straightforward; external units follow outbuilding rules.

Planning in North Somerset

88%

of planning applications granted

86%

decided within the statutory or agreed time

69%

of householder applications decided within 8 weeks

In the year to December 2025, North Somerset decided 1,148 planning applications. 652 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in North Somerset

North Somerset has 39 conservation areas. These include Backwell Church Town, Backwell Farleigh, Backwell West Town, Banwell, Barrow Gurney, Beach Lawns. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

North Somerset has 38 recorded Article 4 directions. These include Agricultural land at Weston-in-Gordano; Great Weston Conservation Area, Weston-super-Mare; Land at Backwell; Land at Blackmoor Road, Abbots Leigh. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact North Somerset planning department to check whether an Article 4 direction applies to your property.

Check with North Somerset planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Battery Storage System

Generally permitted. Internal battery installation is an internal alteration that does not need planning permission. External battery units are treated as outbuildings or ancillary structures and follow Part 1, Class E rules (height limits, not forward of the principal elevation, not covering more than half the curtilage).

Conditions

  • 1Internal installation: no planning permission needed
  • 2External unit: follows outbuilding PD rules
  • 3Must not be forward of the principal elevation
  • 4External units within 2m of a boundary: maximum 2.5m height
  • 5Must not cover more than half the curtilage (combined total)

Size and Dimension Limits

  • Internal: no planning limits
  • External: same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)

When Permitted Development Does Not Apply

  • Listed buildings: internal alterations may still need consent if they affect the building's character
  • Fire safety considerations for lithium-ion battery storage
  • Electrical installation must be carried out by a qualified electrician
  • Some insurers have specific requirements for battery installations

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not specifically cover battery storage units, but the electrical installation must comply with Part P. Work should be carried out by a registered electrician. The installation should comply with the manufacturer's specifications and any relevant fire safety guidance.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact North Somerset building control or use an approved inspector.

How to Apply in North Somerset

If you need planning permission for your battery storage system, you can apply through North Somerset's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed for external units.
Cost:£258
Visit North Somerset Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from North Somerset. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk. Home battery units are small and unobtrusive. Enforcement is extremely unlikely unless an external unit breaches outbuilding PD rules. The main risk is fire safety, which is a Building Regulations and insurance matter.

Frequently Asked Questions

Do I need planning permission for a battery storage system in North Somerset?
Generally permitted. Internal battery installation is an internal alteration that does not need planning permission. External battery units are treated as outbuildings or ancillary structures and follow Part 1, Class E rules (height limits, not forward of the principal elevation, not covering more than half the curtilage). Note: North Somerset has 39 conservation areas (including Backwell Church Town, Backwell Farleigh, Backwell West Town) and 38 recorded Article 4 directions where permitted development rights may be restricted. Check with North Somerset planning department.
Does a battery storage system in North Somerset need building regulations?
Building regulations approval is not usually required for a battery storage system. Building Regulations do not specifically cover battery storage units, but the electrical installation must comply with Part P. Work should be carried out by a registered electrician. The installation should comply with the manufacturer's specifications and any relevant fire safety guidance.
How do I apply for planning permission in North Somerset?
You can apply for planning permission through North Somerset's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed for external units..
How long does planning permission take in North Somerset?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, North Somerset decided 86% of applications within the statutory or agreed time, and 69% of householder applications within 8 weeks.
What percentage of planning applications does North Somerset approve?
North Somerset granted 88% of the 1,148 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.

Find an Electrician in North Somerset

Browse local electricians on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Battery Storage System rules in nearby council areas

Other projects in North Somerset