Do I Need Planning Permission for a Demolition in North Somerset?

Demolishing a building or structure. The rules vary significantly depending on what is being demolished: a dwelling, an outbuilding, a wall, or part of a larger building.

Planning in North Somerset

88%

of planning applications granted

86%

decided within the statutory or agreed time

69%

of householder applications decided within 8 weeks

In the year to December 2025, North Somerset decided 1,148 planning applications. 652 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in North Somerset

North Somerset has 39 conservation areas. These include Backwell Church Town, Backwell Farleigh, Backwell West Town, Banwell, Barrow Gurney, Beach Lawns. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

North Somerset has 38 recorded Article 4 directions. These include Agricultural land at Weston-in-Gordano; Great Weston Conservation Area, Weston-super-Mare; Land at Backwell; Land at Blackmoor Road, Abbots Leigh. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact North Somerset planning department to check whether an Article 4 direction applies to your property.

Check with North Somerset planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Demolition

Whether demolition needs planning permission depends on what is being demolished. Demolition of a dwelling requires planning permission and prior approval under Part 11. Demolition of small outbuildings (under 50 cubic metres) generally does not need permission. Demolition within a conservation area has stricter rules. Internal demolition (removing internal walls) is generally PD.

Conditions

  • 1Demolition of a dwelling: requires planning permission and prior approval (Part 11)
  • 2Small outbuildings and structures under 50 cubic metres: generally do not need PP
  • 3In conservation areas: demolition of any building over 115 cubic metres requires PP
  • 4Internal demolition (non-structural walls): PD as internal alteration
  • 5Demolition of a listed building or a building within its curtilage: requires listed building consent

Size and Dimension Limits

  • Structures under 50 cubic metres: generally no PP needed for demolition
  • In conservation areas: structures over 115 cubic metres require PP for demolition

When Permitted Development Does Not Apply

  • Asbestos survey required before any demolition work
  • Health and safety legislation applies (CDM Regulations for larger projects)
  • Demolition notices may be required under Section 80 of the Building Act 1984
  • Party wall considerations if the structure shares a wall with a neighbour
  • Waste disposal must comply with environmental regulations

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to demolition through the requirement to submit a demolition notice under Section 80 of the Building Act 1984. This must be submitted to the local authority at least 6 weeks before work begins. Covers structural safety during and after demolition, asbestos handling (CAR 2012), dust and noise control, and site safety.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact North Somerset building control or use an approved inspector.

How to Apply in North Somerset

If you need planning permission for your demolition, you can apply through North Somerset's planning department or via the national Planning Portal.

Timeline:8 weeks for planning applications. Section 80 demolition notice: at least 6 weeks before work begins.
Cost:£258 for householder planning applications. Prior approval for dwelling demolition: £120.
Visit North Somerset Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from North Somerset. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

High risk for unauthorised demolition. Demolishing a dwelling without permission and prior approval is a serious breach. In conservation areas, unauthorised demolition of a building is a criminal offence. Demolishing a listed building without consent is also a criminal offence with unlimited fines and potential imprisonment.

Frequently Asked Questions

Do I need planning permission for a demolition in North Somerset?
Whether demolition needs planning permission depends on what is being demolished. Demolition of a dwelling requires planning permission and prior approval under Part 11. Demolition of small outbuildings (under 50 cubic metres) generally does not need permission. Demolition within a conservation area has stricter rules. Internal demolition (removing internal walls) is generally PD. Note: North Somerset has 39 conservation areas (including Backwell Church Town, Backwell Farleigh, Backwell West Town) and 38 recorded Article 4 directions where permitted development rights may be restricted. Check with North Somerset planning department.
Does a demolition in North Somerset need building regulations?
Yes. Building Regulations apply to demolition through the requirement to submit a demolition notice under Section 80 of the Building Act 1984. This must be submitted to the local authority at least 6 weeks before work begins. Covers structural safety during and after demolition, asbestos handling (CAR 2012), dust and noise control, and site safety. Contact North Somerset building control or an approved inspector for details.
How do I apply for planning permission in North Somerset?
You can apply for planning permission through North Somerset's planning department or via the national Planning Portal. £258 for householder planning applications. Prior approval for dwelling demolition: £120.. 8 weeks for planning applications. Section 80 demolition notice: at least 6 weeks before work begins..
How long does planning permission take in North Somerset?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, North Somerset decided 86% of applications within the statutory or agreed time, and 69% of householder applications within 8 weeks.
What percentage of planning applications does North Somerset approve?
North Somerset granted 88% of the 1,148 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.