Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentWarwick (West Midlands)

Do I Need Planning Permission for an Air Source Heat Pump in Warwick?

Installing an air source heat pump (ASHP) to heat your home. ASHPs have specific permitted development rights under Part 14 of the GPDO, subject to noise and size conditions.

Planning in Warwick

90%

of planning applications granted

94%

decided within the statutory or agreed time

47%

of householder applications decided within 8 weeks

In the year to December 2025, Warwick decided 939 planning applications. 525 of these were householder projects such as extensions, loft conversions and outbuildings, of which 94% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Warwick

Warwick has 23 conservation areas. These include Ashow, Baginton, Barford, Bishops Tachbrook, Bubbenhall, Cubbington. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Warwick has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Warwick planning department to check whether an Article 4 direction applies to your property.

Check with Warwick planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Air Source Heat Pump

Generally permitted under Part 14, Class G of the GPDO. One air source heat pump is permitted per property, subject to conditions on size, noise, and position. The unit must comply with MCS planning standards for noise.

Conditions

  • 1Only one heat pump per property under PD
  • 2Must comply with MCS planning standards (MCS 020) for noise
  • 3Must be at least 1m from the property boundary
  • 4Must not be installed on a wall or roof slope fronting a highway (that is the principal or side elevation in designated areas)
  • 5Must not be on a building listed or within the curtilage of a listed building
  • 6Unit must be removed when no longer needed

Size and Dimension Limits

  • Maximum volume of the unit: 0.6 cubic metres (including housing)
  • Must be at least 1m from the property boundary

When Permitted Development Does Not Apply

  • Not PD for listed buildings or within the curtilage of a listed building
  • In designated areas, the unit must not be on a wall or roof forming the principal or side elevation visible from a highway
  • Noise is a key consideration; complaints from neighbours can lead to a statutory nuisance investigation
  • Only one ASHP per property under PD; a second requires planning permission

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to the heating system installation. Covers Part L (conservation of fuel and power, including system efficiency), Part J (combustion appliances, if replacing a gas boiler), and Part P (electrical installation). Work should be carried out by an MCS-certified installer to qualify for the Boiler Upgrade Scheme grant.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Warwick building control or use an approved inspector.

How to Apply in Warwick

If you need planning permission for your air source heat pump, you can apply through Warwick's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Warwick Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Warwick. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk if installed within PD conditions. The most common issue is noise complaints from neighbours, which are dealt with under environmental health (statutory nuisance) legislation rather than planning enforcement. Installing a second ASHP without PP could attract enforcement.

Frequently Asked Questions

Do I need planning permission for an air source heat pump in Warwick?
Generally permitted under Part 14, Class G of the GPDO. One air source heat pump is permitted per property, subject to conditions on size, noise, and position. The unit must comply with MCS planning standards for noise. Note: Warwick has 23 conservation areas (including Ashow, Baginton, Barford) where permitted development rights may be restricted. Check with Warwick planning department.
Does an air source heat pump in Warwick need building regulations?
Yes. Building Regulations apply to the heating system installation. Covers Part L (conservation of fuel and power, including system efficiency), Part J (combustion appliances, if replacing a gas boiler), and Part P (electrical installation). Work should be carried out by an MCS-certified installer to qualify for the Boiler Upgrade Scheme grant. Contact Warwick building control or an approved inspector for details.
How do I apply for planning permission in Warwick?
You can apply for planning permission through Warwick's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Warwick?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Warwick decided 94% of applications within the statutory or agreed time, and 47% of householder applications within 8 weeks.
What percentage of planning applications does Warwick approve?
Warwick granted 90% of the 939 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 94%.

Find a Heat Pump Installer in Warwick

Browse local heat pump installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Air Source Heat Pump rules in nearby council areas

Other projects in Warwick