This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentHarrow (London)

Do I Need Planning Permission for an Air Source Heat Pump in Harrow?

Installing an air source heat pump (ASHP) to heat your home. ASHPs have specific permitted development rights under Part 14 of the GPDO, subject to noise and size conditions.

Planning in Harrow

78%

of planning applications granted

92%

decided within the statutory or agreed time

74%

of householder applications decided within 8 weeks

In the year to December 2025, Harrow decided 1,316 planning applications. 892 of these were householder projects such as extensions, loft conversions and outbuildings, of which 83% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Harrow

Harrow has 27 conservation areas. These include Canons Park Estate Conservation Area, East End Farm Conservation Area Pinner, Harrow Park Conservation Area, Harrow School Conservation Area Harrow on the Hill, Harrow on the Hill Village Conservation Area, Kerry Avenue Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Harrow planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Air Source Heat Pump

Generally permitted under Part 14, Class G of the GPDO. One air source heat pump is permitted per property, subject to conditions on size, noise, and position. The unit must comply with MCS planning standards for noise.

Conditions

  • 1Only one heat pump per property under PD
  • 2Must comply with MCS planning standards (MCS 020) for noise
  • 3Must be at least 1m from the property boundary
  • 4Must not be installed on a wall or roof slope fronting a highway (that is the principal or side elevation in designated areas)
  • 5Must not be on a building listed or within the curtilage of a listed building
  • 6Unit must be removed when no longer needed

Size and Dimension Limits

  • Maximum volume of the unit: 0.6 cubic metres (including housing)
  • Must be at least 1m from the property boundary

When Permitted Development Does Not Apply

  • Not PD for listed buildings or within the curtilage of a listed building
  • In designated areas, the unit must not be on a wall or roof forming the principal or side elevation visible from a highway
  • Noise is a key consideration; complaints from neighbours can lead to a statutory nuisance investigation
  • Only one ASHP per property under PD; a second requires planning permission

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to the heating system installation. Covers Part L (conservation of fuel and power, including system efficiency), Part J (combustion appliances, if replacing a gas boiler), and Part P (electrical installation). Work should be carried out by an MCS-certified installer to qualify for the Boiler Upgrade Scheme grant.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Harrow building control or use an approved inspector.

How to Apply in Harrow

If you need planning permission for your air source heat pump, you can apply through Harrow's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Harrow Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Harrow. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk if installed within PD conditions. The most common issue is noise complaints from neighbours, which are dealt with under environmental health (statutory nuisance) legislation rather than planning enforcement. Installing a second ASHP without PP could attract enforcement.

Frequently Asked Questions

Do I need planning permission for an air source heat pump in Harrow?
Generally permitted under Part 14, Class G of the GPDO. One air source heat pump is permitted per property, subject to conditions on size, noise, and position. The unit must comply with MCS planning standards for noise. Note: Harrow has 27 conservation areas (including Canons Park Estate Conservation Area, East End Farm Conservation Area Pinner, Harrow Park Conservation Area) where permitted development rights may be restricted. Check with Harrow planning department.
Does an air source heat pump in Harrow need building regulations?
Yes. Building Regulations apply to the heating system installation. Covers Part L (conservation of fuel and power, including system efficiency), Part J (combustion appliances, if replacing a gas boiler), and Part P (electrical installation). Work should be carried out by an MCS-certified installer to qualify for the Boiler Upgrade Scheme grant. Contact Harrow building control or an approved inspector for details.
How do I apply for planning permission in Harrow?
You can apply for planning permission through Harrow's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Harrow?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Harrow decided 92% of applications within the statutory or agreed time, and 74% of householder applications within 8 weeks.
What percentage of planning applications does Harrow approve?
Harrow granted 78% of the 1,316 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 83%.

Find a Heat Pump Installer in Harrow

Browse local heat pump installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Air Source Heat Pump rules in nearby council areas

Other projects in Harrow