Estimated cost in Brighton

£2,806 - £9,760

Foundation Excavation and Pour (standard extension)

Typical duration: 3-7 days

Groundworker Prices in Brighton

Foundation Excavation and Pour

£2,806 - £9,760

Labour

£1,830 - £6,100

Materials

£976 - £3,660

Labour 63%Materials 37%

Typical duration: 3-7 days

Drainage Installation

£1,464 - £5,490

Labour

£976 - £3,660

Materials

£488 - £1,830

Labour 67%Materials 33%

Typical duration: 2-5 days

Site Clearance and Levelling

£732 - £3,050

Labour

£610 - £2,440

Materials

£122 - £610

Labour 81%Materials 19%

Typical duration: 1-4 days

How Brighton Compares

CheapestNational avgMost expensive

More expensive

Our model for Brighton is 22% above the base estimate. This is a location assumption, not a measured local quote average.

Illustrative Seasonality for Groundworker Work

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Our seasonal model peaks in Jun and is lowest in Jan. This is not live demand data or a forecast of prices or availability.

What Affects the Price

Foundation Excavation and Pour

  • Foundation type (strip, trench fill, raft, piled)
  • Depth required by building control
  • Ground conditions (clay, rock, water table)
  • Spoil removal and disposal
  • Access for machinery

Drainage Installation

  • Trench length and depth
  • Pipe diameter and gradient
  • Number of manholes and connections
  • Ground conditions
  • Connection to public sewer

Site Clearance and Levelling

  • Site area and condition
  • Volume of material to remove
  • Whether demolition is involved
  • Access for plant and skip

Groundworker Profiles Near Brighton

Find trusted, reviewed groundworker professionals near you. Tradesfolk is completely free to use.

Frequently Asked Questions

How much does a groundworker cost in Brighton?

Groundworker prices in Brighton typically range from £732 for site clearance and levelling to £9,760 for foundation excavation and pour. Prices include both labour and materials.

What is the average cost of foundation excavation and pour in Brighton?

Foundation Excavation and Pour in Brighton costs between £2,806 and £9,760 on average, depending on the scope of work and materials chosen.

When is the cheapest time to hire a groundworker in Brighton?

Demand for groundworker work in Brighton is typically lowest in January. Booking during quieter months may mean better availability and competitive pricing.

Are groundworker prices in Brighton above or below the national average?

Groundworker prices in Brighton are around 22% above the national average, reflecting higher local labour rates and cost of living.

Groundworker prices in nearby towns

Other trade prices in Brighton

Looking for a groundworker in Brighton?

Browse local groundworker profiles with reviews from local homeowners. 100% free.

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co