Bricklayer Costs in Hammersmith
London | Modelled planning ranges | Base prices dated May 2026 | Includes labour and materials
Cost Calculator
Estimated cost in Hammersmith
£685 - £1,918
Garden Wall Construction (standard boundary wall)
Typical duration: 1-3 days
Bricklayer Prices in Hammersmith
Garden Wall Construction
£685 - £1,918Labour
£411 - £1,096
Materials
£274 - £822
Typical duration: 1-3 days
Repointing
£41 - £90Labour
£34 - £69
Materials
£7 - £21
Typical duration: 2-7 days
Extension Brickwork
£3,425 - £9,590Labour
£2,055 - £5,480
Materials
£1,370 - £4,110
Typical duration: 1-3 weeks
How Hammersmith Compares
More expensive
Our model for Hammersmith is 37% above the base estimate. This is a location assumption, not a measured local quote average.
Illustrative Seasonality for Bricklayer Work
Our seasonal model peaks in Jul and is lowest in Jan. This is not live demand data or a forecast of prices or availability.
What Affects the Price
Garden Wall Construction
- Wall length and height
- Brick type and bond pattern
- Foundation requirements
- Pier and coping details
- Access for materials delivery
Repointing
- Area to repoint (square metres)
- Joint depth and mortar condition
- Mortar type and colour matching
- Scaffolding requirements
- Property height
Extension Brickwork
- Extension size and wall area
- Brick type and whether matching is required
- Cavity wall insulation specification
- Window and door opening details
- Weather dependency
Bricklayer Profiles Near Hammersmith
Find trusted, reviewed bricklayer professionals near you. Tradesfolk is completely free to use.
Frequently Asked Questions
How much does a bricklayer cost in Hammersmith?
Bricklayer prices in Hammersmith typically range from £41 for repointing to £9,590 for extension brickwork. Prices include both labour and materials.
What is the average cost of garden wall construction in Hammersmith?
Garden Wall Construction in Hammersmith costs between £685 and £1,918 on average, depending on the scope of work and materials chosen.
When is the cheapest time to hire a bricklayer in Hammersmith?
Demand for bricklayer work in Hammersmith is typically lowest in January. Booking during quieter months may mean better availability and competitive pricing.
Are bricklayer prices in Hammersmith above or below the national average?
Bricklayer prices in Hammersmith are around 37% above the national average, reflecting higher local labour rates and cost of living.
Bricklayer prices in nearby towns
Other trade prices in Hammersmith
Looking for a bricklayer in Hammersmith?
Browse local bricklayer profiles with reviews from local homeowners. 100% free.