Bricklayer Costs in Hammersmith
London | Prices updated for 2026 | All estimates include labour and materials
Cost Calculator
Estimated cost in Hammersmith
£685 - £1,918
Garden Wall Construction (standard boundary wall)
Typical duration: 1-3 days
Bricklayer Prices in Hammersmith
Garden Wall Construction
£685 - £1,918Labour
£411 - £1,096
Materials
£274 - £822
Typical duration: 1-3 days
Repointing
£41 - £90Labour
£34 - £69
Materials
£7 - £21
Typical duration: 2-7 days
Extension Brickwork
£3,425 - £9,590Labour
£2,055 - £5,480
Materials
£1,370 - £4,110
Typical duration: 1-3 weeks
How Hammersmith Compares
More expensive
Trade prices in Hammersmith are typically 37% above the national average. This reflects local labour rates and the cost of living in London.
Seasonal Demand for Bricklayer Work
Peak demand is typically in Jul, with the quietest period around Jan. You may find lower prices and better availability during off-peak months.
What Affects the Price
Garden Wall Construction
- Wall length and height
- Brick type and bond pattern
- Foundation requirements
- Pier and coping details
- Access for materials delivery
Repointing
- Area to repoint (square metres)
- Joint depth and mortar condition
- Mortar type and colour matching
- Scaffolding requirements
- Property height
Extension Brickwork
- Extension size and wall area
- Brick type and whether matching is required
- Cavity wall insulation specification
- Window and door opening details
- Weather dependency
Bricklayer Profiles Near Hammersmith
Find trusted, reviewed bricklayer professionals near you. Tradesfolk is completely free to use.
Frequently Asked Questions
How much does a bricklayer cost in Hammersmith?
Bricklayer prices in Hammersmith typically range from £41 for repointing to £9,590 for extension brickwork. Prices include both labour and materials.
What is the average cost of garden wall construction in Hammersmith?
Garden Wall Construction in Hammersmith costs between £685 and £1,918 on average, depending on the scope of work and materials chosen.
When is the cheapest time to hire a bricklayer in Hammersmith?
Demand for bricklayer work in Hammersmith is typically lowest in January. Booking during quieter months may mean better availability and competitive pricing.
Are bricklayer prices in Hammersmith above or below the national average?
Bricklayer prices in Hammersmith are around 37% above the national average, reflecting higher local labour rates and cost of living.
Looking for a bricklayer in Hammersmith?
Browse verified bricklayer profiles with reviews from local homeowners. 100% free.