Bricklayer Costs in Gateshead
North East | Prices updated for 2026 | All estimates include labour and materials
Cost Calculator
Estimated cost in Gateshead
£440 - £1,232
Garden Wall Construction (standard boundary wall)
Typical duration: 1-3 days
Bricklayer Prices in Gateshead
Garden Wall Construction
£440 - £1,232Labour
£264 - £704
Materials
£176 - £528
Typical duration: 1-3 days
Repointing
£26 - £57Labour
£22 - £44
Materials
£4 - £13
Typical duration: 2-7 days
Extension Brickwork
£2,200 - £6,160Labour
£1,320 - £3,520
Materials
£880 - £2,640
Typical duration: 1-3 weeks
How Gateshead Compares
Cheaper than average
Trade prices in Gateshead are typically 12% below the national average. This reflects local labour rates and the cost of living in North East.
Seasonal Demand for Bricklayer Work
Peak demand is typically in Jul, with the quietest period around Jan. You may find lower prices and better availability during off-peak months.
What Affects the Price
Garden Wall Construction
- Wall length and height
- Brick type and bond pattern
- Foundation requirements
- Pier and coping details
- Access for materials delivery
Repointing
- Area to repoint (square metres)
- Joint depth and mortar condition
- Mortar type and colour matching
- Scaffolding requirements
- Property height
Extension Brickwork
- Extension size and wall area
- Brick type and whether matching is required
- Cavity wall insulation specification
- Window and door opening details
- Weather dependency
Bricklayer Profiles Near Gateshead
Find trusted, reviewed bricklayer professionals near you. Tradesfolk is completely free to use.
Frequently Asked Questions
How much does a bricklayer cost in Gateshead?
Bricklayer prices in Gateshead typically range from £26 for repointing to £6,160 for extension brickwork. Prices include both labour and materials.
What is the average cost of garden wall construction in Gateshead?
Garden Wall Construction in Gateshead costs between £440 and £1,232 on average, depending on the scope of work and materials chosen.
When is the cheapest time to hire a bricklayer in Gateshead?
Demand for bricklayer work in Gateshead is typically lowest in January. Booking during quieter months may mean better availability and competitive pricing.
Are bricklayer prices in Gateshead above or below the national average?
Bricklayer prices in Gateshead are around 12% below the national average, making it a more affordable area for this type of work.
Looking for a bricklayer in Gateshead?
Browse verified bricklayer profiles with reviews from local homeowners. 100% free.