This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationTonbridge and Malling (South East)

Do I Need Planning Permission for a Wrap-Around Extension in Tonbridge and Malling?

A wrap-around extension combines a side and rear extension into one L-shaped structure. This creates a large open-plan space but must comply with the PD rules for both side and rear extensions simultaneously.

Planning in Tonbridge and Malling

94%

of planning applications granted

85%

decided within the statutory or agreed time

51%

of householder applications decided within 8 weeks

In the year to December 2025, Tonbridge and Malling decided 891 planning applications. 546 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Tonbridge and Malling

Tonbridge and Malling has 60 conservation areas. These include Addington, Aldon, Offham, Aylesford, Birling, Birling Place, Bradbourne, East Malling. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Tonbridge and Malling planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Wrap-Around Extension

Whether a wrap-around extension falls under permitted development depends on the specifics, as it must comply with PD rules for both side and rear extensions at the same time. In practice, many wrap-around extensions exceed PD limits and require a planning application.

Conditions

  • 1Must satisfy both side extension and rear extension PD conditions simultaneously
  • 2Side component must not exceed half the width of the original house
  • 3Rear component must not exceed 3m (semi/terraced) or 4m (detached) depth under standard PD
  • 4Materials must match the existing dwelling
  • 5Cumulative additions must not cover more than half the curtilage

Size and Dimension Limits

  • Side: must not exceed half the original house width
  • Rear: 3m (semi/terraced) or 4m (detached) under standard PD
  • Maximum height: 4m
  • Eaves: 3m if within 2m of a boundary

When Permitted Development Does Not Apply

  • Often exceeds PD limits due to cumulative impact, requiring a full planning application
  • Must not cover more than half the curtilage (total of all extensions and outbuildings)
  • Not permitted development in designated areas for the side element
  • Previous extensions and outbuildings count towards the cumulative limits

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval required covering all structural, thermal, ventilation, drainage, fire safety, and electrical requirements. The junction between side and rear elements requires careful structural detailing.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Tonbridge and Malling building control or use an approved inspector.

How to Apply in Tonbridge and Malling

If you need planning permission for your wrap-around extension, you can apply through Tonbridge and Malling's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Tonbridge and Malling Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Tonbridge and Malling. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement is a significant risk for wrap-around extensions built without permission, as they are highly visible and substantially alter the dwelling. The council can require demolition. Mortgage lenders and buyers' solicitors will scrutinise these carefully.

Frequently Asked Questions

Do I need planning permission for a wrap-around extension in Tonbridge and Malling?
Whether a wrap-around extension falls under permitted development depends on the specifics, as it must comply with PD rules for both side and rear extensions at the same time. In practice, many wrap-around extensions exceed PD limits and require a planning application. Note: Tonbridge and Malling has 60 conservation areas (including Addington, Aldon, Offham, Aylesford) where permitted development rights may be restricted. Check with Tonbridge and Malling planning department.
Does a wrap-around extension in Tonbridge and Malling need building regulations?
Yes. Building Regulations approval required covering all structural, thermal, ventilation, drainage, fire safety, and electrical requirements. The junction between side and rear elements requires careful structural detailing. Contact Tonbridge and Malling building control or an approved inspector for details.
How do I apply for planning permission in Tonbridge and Malling?
You can apply for planning permission through Tonbridge and Malling's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Tonbridge and Malling?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Tonbridge and Malling decided 85% of applications within the statutory or agreed time, and 51% of householder applications within 8 weeks.
What percentage of planning applications does Tonbridge and Malling approve?
Tonbridge and Malling granted 94% of the 891 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Builder in Tonbridge and Malling

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Wrap-Around Extension rules in nearby council areas

Other projects in Tonbridge and Malling