This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationNorth East Derbyshire (East Midlands)

Do I Need Planning Permission for a Wrap-Around Extension in North East Derbyshire?

A wrap-around extension combines a side and rear extension into one L-shaped structure. This creates a large open-plan space but must comply with the PD rules for both side and rear extensions simultaneously.

Planning in North East Derbyshire

91%

of planning applications granted

92%

decided within the statutory or agreed time

64%

of householder applications decided within 8 weeks

In the year to December 2025, North East Derbyshire decided 516 planning applications. 301 of these were householder projects such as extensions, loft conversions and outbuildings, of which 92% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in North East Derbyshire

North East Derbyshire has 32 conservation areas. These include Amber Mill and Toad Hole, Ashover Village, Barlow, Barlow Grange, Barlow Mills and Crow Holes, Barlow Woodseats and Johnnygate. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with North East Derbyshire planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Wrap-Around Extension

Whether a wrap-around extension falls under permitted development depends on the specifics, as it must comply with PD rules for both side and rear extensions at the same time. In practice, many wrap-around extensions exceed PD limits and require a planning application.

Conditions

  • 1Must satisfy both side extension and rear extension PD conditions simultaneously
  • 2Side component must not exceed half the width of the original house
  • 3Rear component must not exceed 3m (semi/terraced) or 4m (detached) depth under standard PD
  • 4Materials must match the existing dwelling
  • 5Cumulative additions must not cover more than half the curtilage

Size and Dimension Limits

  • Side: must not exceed half the original house width
  • Rear: 3m (semi/terraced) or 4m (detached) under standard PD
  • Maximum height: 4m
  • Eaves: 3m if within 2m of a boundary

When Permitted Development Does Not Apply

  • Often exceeds PD limits due to cumulative impact, requiring a full planning application
  • Must not cover more than half the curtilage (total of all extensions and outbuildings)
  • Not permitted development in designated areas for the side element
  • Previous extensions and outbuildings count towards the cumulative limits

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval required covering all structural, thermal, ventilation, drainage, fire safety, and electrical requirements. The junction between side and rear elements requires careful structural detailing.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact North East Derbyshire building control or use an approved inspector.

How to Apply in North East Derbyshire

If you need planning permission for your wrap-around extension, you can apply through North East Derbyshire's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit North East Derbyshire Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from North East Derbyshire. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement is a significant risk for wrap-around extensions built without permission, as they are highly visible and substantially alter the dwelling. The council can require demolition. Mortgage lenders and buyers' solicitors will scrutinise these carefully.

Frequently Asked Questions

Do I need planning permission for a wrap-around extension in North East Derbyshire?
Whether a wrap-around extension falls under permitted development depends on the specifics, as it must comply with PD rules for both side and rear extensions at the same time. In practice, many wrap-around extensions exceed PD limits and require a planning application. Note: North East Derbyshire has 32 conservation areas (including Amber Mill and Toad Hole, Ashover Village, Barlow) where permitted development rights may be restricted. Check with North East Derbyshire planning department.
Does a wrap-around extension in North East Derbyshire need building regulations?
Yes. Building Regulations approval required covering all structural, thermal, ventilation, drainage, fire safety, and electrical requirements. The junction between side and rear elements requires careful structural detailing. Contact North East Derbyshire building control or an approved inspector for details.
How do I apply for planning permission in North East Derbyshire?
You can apply for planning permission through North East Derbyshire's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in North East Derbyshire?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, North East Derbyshire decided 92% of applications within the statutory or agreed time, and 64% of householder applications within 8 weeks.
What percentage of planning applications does North East Derbyshire approve?
North East Derbyshire granted 91% of the 516 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 92%.

Find a Builder in North East Derbyshire

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.