This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.
Do I Need Planning Permission for a Wrap-Around Extension in Havant?
A wrap-around extension combines a side and rear extension into one L-shaped structure. This creates a large open-plan space but must comply with the PD rules for both side and rear extensions simultaneously.
Planning in Havant
94%
of planning applications granted
80%
decided within the statutory or agreed time
37%
of householder applications decided within 8 weeks
In the year to December 2025, Havant decided 419 planning applications. 294 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.
Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.
Important: Additional Restrictions May Apply in Havant
Havant has 14 conservation areas. These include Brockhampton, Coastguards, Emsworth, Langstone, Lymbourn Road, Mill Lane. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.
Havant has 6 recorded Article 4 directions. These include Langstone. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Havant planning department to check whether an Article 4 direction applies to your property.
Check with Havant planning department before starting work to confirm whether your property is affected by any special designations.
Permitted Development Rules for a Wrap-Around Extension
Whether a wrap-around extension falls under permitted development depends on the specifics, as it must comply with PD rules for both side and rear extensions at the same time. In practice, many wrap-around extensions exceed PD limits and require a planning application.
Conditions
- 1Must satisfy both side extension and rear extension PD conditions simultaneously
- 2Side component must not exceed half the width of the original house
- 3Rear component must not exceed 3m (semi/terraced) or 4m (detached) depth under standard PD
- 4Materials must match the existing dwelling
- 5Cumulative additions must not cover more than half the curtilage
Size and Dimension Limits
- Side: must not exceed half the original house width
- Rear: 3m (semi/terraced) or 4m (detached) under standard PD
- Maximum height: 4m
- Eaves: 3m if within 2m of a boundary
When Permitted Development Does Not Apply
- Often exceeds PD limits due to cumulative impact, requiring a full planning application
- Must not cover more than half the curtilage (total of all extensions and outbuildings)
- Not permitted development in designated areas for the side element
- Previous extensions and outbuildings count towards the cumulative limits
What About Building Regulations?
Building regulations approval is likely required
Building Regulations approval required covering all structural, thermal, ventilation, drainage, fire safety, and electrical requirements. The junction between side and rear elements requires careful structural detailing.
Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Havant building control or use an approved inspector.
How to Apply in Havant
If you need planning permission for your wrap-around extension, you can apply through Havant's planning department or via the national Planning Portal.
If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Havant. This provides proof that your project does not need planning permission, which can be helpful when selling your property.
What Happens If I Build Without Permission?
Enforcement is a significant risk for wrap-around extensions built without permission, as they are highly visible and substantially alter the dwelling. The council can require demolition. Mortgage lenders and buyers' solicitors will scrutinise these carefully.
Frequently Asked Questions
Do I need planning permission for a wrap-around extension in Havant?
Does a wrap-around extension in Havant need building regulations?
How do I apply for planning permission in Havant?
How long does planning permission take in Havant?
What percentage of planning applications does Havant approve?