Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationBromley (London)

Do I Need Planning Permission for a Wrap-Around Extension in Bromley?

A wrap-around extension combines a side and rear extension into one L-shaped structure. This creates a large open-plan space but must comply with the PD rules for both side and rear extensions simultaneously.

Planning in Bromley

75%

of planning applications granted

84%

decided within the statutory or agreed time

65%

of householder applications decided within 8 weeks

In the year to December 2025, Bromley decided 2,171 planning applications. 1,541 of these were householder projects such as extensions, loft conversions and outbuildings, of which 78% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Bromley

Bromley has 43 conservation areas. These include Aldersmead Road, Beckenham, Alexandra Cottages (Parish Lane), Barnmead Road, Beckenham, Beckenham Place Park, Belvedere Road, Anerley, Bickley Park. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Bromley has 108 recorded Article 4 directions. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Bromley planning department to check whether an Article 4 direction applies to your property.

Check with Bromley planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Wrap-Around Extension

Whether a wrap-around extension falls under permitted development depends on the specifics, as it must comply with PD rules for both side and rear extensions at the same time. In practice, many wrap-around extensions exceed PD limits and require a planning application.

Conditions

  • 1Must satisfy both side extension and rear extension PD conditions simultaneously
  • 2Side component must not exceed half the width of the original house
  • 3Rear component must not exceed 3m (semi/terraced) or 4m (detached) depth under standard PD
  • 4Materials must match the existing dwelling
  • 5Cumulative additions must not cover more than half the curtilage

Size and Dimension Limits

  • Side: must not exceed half the original house width
  • Rear: 3m (semi/terraced) or 4m (detached) under standard PD
  • Maximum height: 4m
  • Eaves: 3m if within 2m of a boundary

When Permitted Development Does Not Apply

  • Often exceeds PD limits due to cumulative impact, requiring a full planning application
  • Must not cover more than half the curtilage (total of all extensions and outbuildings)
  • Not permitted development in designated areas for the side element
  • Previous extensions and outbuildings count towards the cumulative limits

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval required covering all structural, thermal, ventilation, drainage, fire safety, and electrical requirements. The junction between side and rear elements requires careful structural detailing.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Bromley building control or use an approved inspector.

How to Apply in Bromley

If you need planning permission for your wrap-around extension, you can apply through Bromley's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Bromley Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Bromley. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement is a significant risk for wrap-around extensions built without permission, as they are highly visible and substantially alter the dwelling. The council can require demolition. Mortgage lenders and buyers' solicitors will scrutinise these carefully.

Frequently Asked Questions

Do I need planning permission for a wrap-around extension in Bromley?
Whether a wrap-around extension falls under permitted development depends on the specifics, as it must comply with PD rules for both side and rear extensions at the same time. In practice, many wrap-around extensions exceed PD limits and require a planning application. Note: Bromley has 43 conservation areas (including Aldersmead Road, Beckenham, Alexandra Cottages (Parish Lane), Barnmead Road, Beckenham) and 108 recorded Article 4 directions where permitted development rights may be restricted. Check with Bromley planning department.
Does a wrap-around extension in Bromley need building regulations?
Yes. Building Regulations approval required covering all structural, thermal, ventilation, drainage, fire safety, and electrical requirements. The junction between side and rear elements requires careful structural detailing. Contact Bromley building control or an approved inspector for details.
How do I apply for planning permission in Bromley?
You can apply for planning permission through Bromley's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Bromley?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Bromley decided 84% of applications within the statutory or agreed time, and 65% of householder applications within 8 weeks.
What percentage of planning applications does Bromley approve?
Bromley granted 75% of the 2,171 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 78%.

Find a Builder in Bromley

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Wrap-Around Extension rules in nearby council areas

Other projects in Bromley