Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentSutton (London)

Do I Need Planning Permission for a Two-Storey Side Extension in Sutton?

A two-storey extension to the side of your home, significantly increasing floor space on both levels. Subject to strict PD conditions to prevent a 'terracing' effect in residential streets.

Planning in Sutton

88%

of planning applications granted

96%

decided within the statutory or agreed time

90%

of householder applications decided within 8 weeks

In the year to December 2025, Sutton decided 901 planning applications. 654 of these were householder projects such as extensions, loft conversions and outbuildings, of which 92% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Sutton

Sutton has conservation areas. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Sutton planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Two-Storey Side Extension

Generally permitted under Part 1, Class A, but with strict conditions designed to prevent properties appearing to merge with neighbours. Must maintain a minimum 1m gap from the side boundary at first-floor level and above.

Conditions

  • 1Must not exceed half the width of the original house
  • 2Must maintain at least 1m from the side boundary at first-floor level
  • 3Roof pitch must match the existing house as far as practicable
  • 4Materials must be similar in appearance to the existing dwelling
  • 5Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor

Size and Dimension Limits

  • Width: must not exceed half the width of the original dwelling
  • Height: must not exceed the height of the existing roof ridge
  • Must maintain 1m gap from side boundary at first floor and above

When Permitted Development Does Not Apply

  • Must not cover more than half the curtilage
  • Does not apply in front of the principal elevation
  • Not permitted development in conservation areas, AONB, National Parks, the Broads, or World Heritage Sites
  • Does not apply to flats or maisonettes

What About Building Regulations?

Building regulations approval is likely required

Full Building Regulations approval needed covering structural integrity, foundations, thermal performance, fire safety and escape routes, sound insulation between floors, ventilation, drainage, and electrical work.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Sutton building control or use an approved inspector.

How to Apply in Sutton

If you need planning permission for your two-storey side extension, you can apply through Sutton's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Sutton Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Sutton. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement can require demolition of the upper floor or the entire extension. Two-storey side extensions that create a terracing effect are particularly likely to attract enforcement. Solicitors routinely flag these during property sales.

Frequently Asked Questions

Do I need planning permission for a two-storey side extension in Sutton?
Generally permitted under Part 1, Class A, but with strict conditions designed to prevent properties appearing to merge with neighbours. Must maintain a minimum 1m gap from the side boundary at first-floor level and above. Note: Sutton has conservation areas which may restrict permitted development rights in some areas. Check with Sutton planning department.
Does a two-storey side extension in Sutton need building regulations?
Yes. Full Building Regulations approval needed covering structural integrity, foundations, thermal performance, fire safety and escape routes, sound insulation between floors, ventilation, drainage, and electrical work. Contact Sutton building control or an approved inspector for details.
How do I apply for planning permission in Sutton?
You can apply for planning permission through Sutton's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Sutton?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Sutton decided 96% of applications within the statutory or agreed time, and 90% of householder applications within 8 weeks.
What percentage of planning applications does Sutton approve?
Sutton granted 88% of the 901 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 92%.

Find a Builder in Sutton

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Two-Storey Side Extension rules in nearby council areas

Other projects in Sutton