Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentSalford (North West)

Do I Need Planning Permission for a Two-Storey Side Extension in Salford?

A two-storey extension to the side of your home, significantly increasing floor space on both levels. Subject to strict PD conditions to prevent a 'terracing' effect in residential streets.

Planning in Salford

90%

of planning applications granted

94%

decided within the statutory or agreed time

53%

of householder applications decided within 8 weeks

In the year to December 2025, Salford decided 783 planning applications. 400 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Salford

Salford has 16 conservation areas. These include Adelphi Bexley Square conservation area, Barton-upon-Irwell conservation area, Cathedral conservation area, Cliff conservation area, Crescent conservation area, Ellesmere Park conservation area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Salford has 3 recorded Article 4 directions. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Salford planning department to check whether an Article 4 direction applies to your property.

Check with Salford planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Two-Storey Side Extension

Generally permitted under Part 1, Class A, but with strict conditions designed to prevent properties appearing to merge with neighbours. Must maintain a minimum 1m gap from the side boundary at first-floor level and above.

Conditions

  • 1Must not exceed half the width of the original house
  • 2Must maintain at least 1m from the side boundary at first-floor level
  • 3Roof pitch must match the existing house as far as practicable
  • 4Materials must be similar in appearance to the existing dwelling
  • 5Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor

Size and Dimension Limits

  • Width: must not exceed half the width of the original dwelling
  • Height: must not exceed the height of the existing roof ridge
  • Must maintain 1m gap from side boundary at first floor and above

When Permitted Development Does Not Apply

  • Must not cover more than half the curtilage
  • Does not apply in front of the principal elevation
  • Not permitted development in conservation areas, AONB, National Parks, the Broads, or World Heritage Sites
  • Does not apply to flats or maisonettes

What About Building Regulations?

Building regulations approval is likely required

Full Building Regulations approval needed covering structural integrity, foundations, thermal performance, fire safety and escape routes, sound insulation between floors, ventilation, drainage, and electrical work.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Salford building control or use an approved inspector.

How to Apply in Salford

If you need planning permission for your two-storey side extension, you can apply through Salford's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Salford Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Salford. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement can require demolition of the upper floor or the entire extension. Two-storey side extensions that create a terracing effect are particularly likely to attract enforcement. Solicitors routinely flag these during property sales.

Frequently Asked Questions

Do I need planning permission for a two-storey side extension in Salford?
Generally permitted under Part 1, Class A, but with strict conditions designed to prevent properties appearing to merge with neighbours. Must maintain a minimum 1m gap from the side boundary at first-floor level and above. Note: Salford has 16 conservation areas (including Adelphi Bexley Square conservation area, Barton-upon-Irwell conservation area, Cathedral conservation area) and 3 recorded Article 4 directions where permitted development rights may be restricted. Check with Salford planning department.
Does a two-storey side extension in Salford need building regulations?
Yes. Full Building Regulations approval needed covering structural integrity, foundations, thermal performance, fire safety and escape routes, sound insulation between floors, ventilation, drainage, and electrical work. Contact Salford building control or an approved inspector for details.
How do I apply for planning permission in Salford?
You can apply for planning permission through Salford's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Salford?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Salford decided 94% of applications within the statutory or agreed time, and 53% of householder applications within 8 weeks.
What percentage of planning applications does Salford approve?
Salford granted 90% of the 783 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Builder in Salford

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Two-Storey Side Extension rules in nearby council areas

Other projects in Salford